Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
654
matching recommendationsNAICS | 3212 | Veneer, Plywood, and Engineered Wood Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0496 # 07 Y:2006 | 07 | 2006 | UPGRADE CONTROLS ON COMPRESSORS | $8,030 | $2,000 | Not Implemented |
OR0496 # 08 Y:2006 | 08 | 2006 | USE PHOTOCELL CONTROLS | $2,400 | $900 | Implemented |
OR0496 # 09 Y:2006 | 09 | 2006 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,425 | $0 | Not Implemented |
OR0496 # 10 Y:2006 | 10 | 2006 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $780 | $295 | Not Implemented |
OR0496 # 11 Y:2006 | 11 | 2006 | UPGRADE CONTROLS ON COMPRESSORS | $415 | $600 | Not Implemented |
AS0407 # 01 Y:2005 | 01 | 2005 | INSTALL EQUIPMENT TO MOVE PRODUCT | $257,790 | $218,456 | Not Implemented |
AS0407 # 02 Y:2005 | 02 | 2005 | USE SOLAR HEAT TO HEAT WATER | $1,251 | $3,200 | Not Implemented |
AS0407 # 03 Y:2005 | 03 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $989 | $2,000 | Not Implemented |
AS0407 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $744 | $2,000 | Not Implemented |
CO0576 # 01 Y:2005 | 01 | 2005 | INSTALL ROTATING CAROUSELS TO REDUCE SET-UP TIMES | $84,000 | $30,670 | Not Implemented |
CO0576 # 02 Y:2005 | 02 | 2005 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $4,450 | $0 | Not Implemented |
CO0576 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,540 | $190 | Implemented |
CO0576 # 04 Y:2005 | 04 | 2005 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $200 | $170 | Implemented |
CO0576 # 05 Y:2005 | 05 | 2005 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $6,190 | $17,170 | Not Implemented |
CO0576 # 06 Y:2005 | 06 | 2005 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,670 | $9,240 | Not Implemented |
CO0576 # 07 Y:2005 | 07 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,740 | $980 | Not Implemented |
CO0576 # 08 Y:2005 | 08 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $920 | $1,440 | Not Implemented |
OR0489 # 01 Y:2005 | 01 | 2005 | UPGRADE CONTROLS ON COMPRESSORS | $19,500 | $5,400 | Not Implemented |
OR0489 # 02 Y:2005 | 02 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,600 | $340 | Implemented |
OR0489 # 03 Y:2005 | 03 | 2005 | PURCHASE EQUIPMENT INSTEAD OF LEASING | $80,000 | $58,000 | Not Implemented |
OR0489 # 04 Y:2005 | 04 | 2005 | USE PHOTOCELL CONTROLS | $2,330 | $100 | Implemented |
OR0489 # 05 Y:2005 | 05 | 2005 | ADJUST VENTS TO MINIMIZE ENERGY USE | $24,900 | $12 | Implemented |
OR0489 # 06 Y:2005 | 06 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,100 | $15,400 | Not Implemented |
OR0489 # 07 Y:2005 | 07 | 2005 | INSULATE BARE EQUIPMENT | $1,800 | $2,100 | Implemented |
OR0489 # 08 Y:2005 | 08 | 2005 | INSTALL OCCUPANCY SENSORS | $1,450 | $3,590 | Implemented |