Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
24
matching recommendationsNAICS | 321211 | Hardwood Veneer and Plywood Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0260 # 06 Y:2022 | 06 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,000 | $1,784 | Not Implemented |
UA0260 # 05 Y:2022 | 05 | 2022 | OPTIMIZE PLANT POWER FACTOR | $90,617 | $35,347 | Implemented |
UA0260 # 04 Y:2022 | 04 | 2022 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $230,787 | $328,350 | Not Implemented |
UA0260 # 03 Y:2022 | 03 | 2022 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $429,299 | $2,825,211 | Not Implemented |
UA0260 # 02 Y:2022 | 02 | 2022 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $3,710 | $1,651 | Implemented |
UA0260 # 01 Y:2022 | 01 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $19,881 | $1,000 | Not Implemented |
UA0156 # 05 Y:2016 | 05 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $27,817 | $1,000 | Not Implemented |
UA0156 # 04 Y:2016 | 04 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $28,560 | $700 | Implemented |
UA0156 # 03 Y:2016 | 03 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $30,024 | $6,995 | Not Implemented |
UA0156 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $78,495 | $82,466 | Implemented |
UA0156 # 01 Y:2016 | 01 | 2016 | INSULATE FEEDWATER TANK | $34,968 | $50,000 | Implemented |
UA0150 # 04 Y:2015 | 04 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,984 | $15,128 | Not Implemented |
UA0150 # 03 Y:2015 | 03 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,195 | $800 | Implemented |
UA0150 # 02 Y:2015 | 02 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $24,229 | $2,995 | Implemented |
UA0150 # 01 Y:2015 | 01 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,421 | $49,673 | Not Implemented |
UA0088 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,558 | $22,841 | Implemented |
UA0088 # 09 Y:2012 | 09 | 2012 | OPTIMIZE PLANT POWER FACTOR | $13,879 | $21,400 | Not Implemented |
UA0088 # 08 Y:2012 | 08 | 2012 | REPAIR AND ELIMINATE STEAM LEAKS | $1,371 | $2,780 | Implemented |
UA0088 # 07 Y:2012 | 07 | 2012 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $856 | $2,722 | Implemented |
UA0088 # 06 Y:2012 | 06 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $912 | $306 | Not Implemented |
UA0088 # 05 Y:2012 | 05 | 2012 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $10,103 | $160 | Implemented |
UA0088 # 04 Y:2012 | 04 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,268 | $1,600 | Implemented |
UA0088 # 03 Y:2012 | 03 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,088 | $2,500 | Implemented |
UA0088 # 02 Y:2012 | 02 | 2012 | USE PHOTOCELL CONTROLS | $687 | $651 | Implemented |