Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2012
Principal Product Hardwood Plywood
NAICS 321211 - Hardwood Veneer and Plywood Manufacturing
SIC 2435 - Hardwood Veneer And Plywood
Sales $10,000,000-$50,000,000
# of Employees 72
Plant Area (Sq.Ft.) 210,000
Annual Production 25,000 Thousand Feet
Production Hrs. Annual 6,864
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $622,649 11,482,636 kWh $0.05
Electricity Demand $78,813 27,084 kW-months/year $2.91
Electricity Fees $61,452 - $ -
Wood $68,985 50,261 MMBtu $1.37
TOTAL ENERGY COSTS $831,899
RECOMMENDED SAVINGS* $66,722 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $51,931
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Wood Electricity Usage Electricity Demand Electricity Fees Wood
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$15,558
Cost:
$22,841
$13,526 249,420 $1,269 436 $763 - - - $13,526
249,420
kWh
$1,269
436
kW-months/year
$763
-
$
-
-
MMBtu
02: 2.7134 USE PHOTOCELL CONTROLS Savings:
$687
Cost:
$651
$653 12,038 - - $34 - - - $653
12,038
kWh
-
-
kW-months/year
$34
-
$
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$15,088
Cost:
$2,500
$13,369 246,519 $979 336 $740 - - - $13,369
246,519
kWh
$979
336
kW-months/year
$740
-
$
-
-
MMBtu
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$8,268
Cost:
$1,600
$7,169 132,193 $693 238 $406 - - - $7,169
132,193
kWh
$693
238
kW-months/year
$406
-
$
-
-
MMBtu
05: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$10,103
Cost:
$160
$9,607 177,160 - - $496 - - - $9,607
177,160
kWh
-
-
kW-months/year
$496
-
$
-
-
MMBtu
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$912
Cost:
$306
$791 14,595 $76 26 $45 - - - $791
14,595
kWh
$76
26
kW-months/year
$45
-
$
-
-
MMBtu
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$856
Cost:
$2,722
$709 13,072 $105 36 $42 - - - $709
13,072
kWh
$105
36
kW-months/year
$42
-
$
-
-
MMBtu
08: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$1,371
Cost:
$2,780
- - - - - - $1,371 999 -
-
kWh
-
-
kW-months/year
-
-
$
$1,371
999
MMBtu
09: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$13,879
Cost:
$21,400
- - $13,198 4,535 $681 - - - -
-
kWh
$13,198
4,535
kW-months/year
$681
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$66,722
Cost:
$54,960
$45,824 844,997 $16,320 5,607 $3,207 - $1,371 999 $45,824
844,997
kWh
$16,320
5,607
kW-months/year
$3,207
-
$
$1,371
999
MMBtu
TOTAL IMPLEMENTED Savings:
$51,931
Cost:
$33,254
$45,033 830,402 $3,046 1,046 $2,481 - $1,371 999 $45,033
830,402
kWh
$3,046
1,046
kW-months/year
$2,481
-
$
$1,371
999
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Wood Electricity Usage Electricity Demand Electricity Fees Wood