IAC logo
Search IAC Recommendations
Sponsored by:
EERE AMO
IAC logo
Search IAC Recommendations

894

matching recommendations
Reset
NAICS 32191 Millwork
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0739 # 01 Y:2021 01 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,888 $0 Implemented
OR0739 # 03 Y:2021 03 2021 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $11,419 $32,321 Not Implemented
OR0739 # 02 Y:2021 02 2021 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $12,852 $1,794 Not Implemented
LS2113 # 02 Y:2021 02 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,312 $318 Not Implemented
LS2113 # 04 Y:2021 04 2021 INSTALL OCCUPANCY SENSORS $2,236 $646 Not Implemented
LS2113 # 01 Y:2021 01 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,608 $50 Not Implemented
LS2113 # 06 Y:2021 06 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,512 $6,847 Implemented
LS2113 # 05 Y:2021 05 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $40,876 $16,200 Not Implemented
LS2113 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,491 $585 Implemented
LE0511 # 01 Y:2021 01 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $824 $35 Not Implemented
LE0511 # 07 Y:2021 07 2021 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $1,243 $6,000 Not Implemented
LE0511 # 06 Y:2021 06 2021 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,092 $12,000 Not Implemented
LE0511 # 05 Y:2021 05 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $289 $1,000 Not Implemented
LE0511 # 04 Y:2021 04 2021 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $2,375 $7,600 Not Implemented
LE0511 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,197 $14,875 Implemented
LE0511 # 03 Y:2021 03 2021 RECOVER WASTE HEAT FROM EQUIPMENT $2,917 $8,000 Not Implemented
GT0955 # 02 Y:2021 02 2021 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $5,146 $2,000 Implemented
GT0955 # 01 Y:2021 01 2021 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,515 $2,000 Not Implemented
GT0955 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,445 $4,419 Implemented
GT0955 # 04 Y:2021 04 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $295 $477 Not Implemented
GT0955 # 06 Y:2021 06 2021 USE SOLAR HEAT TO MAKE ELECTRICTY $70,408 $429,498 Not Implemented
GT0955 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,967 $1,850 Implemented
LE0501 # 02 Y:2021 02 2021 INSTALL TIMERS AND/OR THERMOSTATS $985 $100 n/a
LE0501 # 03 Y:2021 03 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $560 $500 n/a
LE0501 # 01 Y:2021 01 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,133 $100 n/a