IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

971

matching recommendations
Reset
NAICS 32191 Millwork
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0430 # 01 Y:2011 01 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $70,581 $20,000 Not Implemented
WV0430 # 02 Y:2011 02 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $43,659 $3,500 Implemented
WV0430 # 03 Y:2011 03 2011 USE RADIANT HEATER FOR SPOT HEATING $39,290 $65,840 Not Implemented
WV0430 # 04 Y:2011 04 2011 UPGRADE CONTROLS ON COMPRESSORS $34,733 $26,650 Implemented
WV0430 # 05 Y:2011 05 2011 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $28,475 $76,200 Not Implemented
WV0430 # 06 Y:2011 06 2011 OPTIMIZE PLANT POWER FACTOR $25,696 $37,805 Not Implemented
WV0430 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,692 $37,460 Implemented
WV0430 # 08 Y:2011 08 2011 COMBINE UTILITY METERS $10,426 $20,000 Not Implemented
WV0430 # 09 Y:2011 09 2011 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $8,265 $57,400 Not Implemented
TT0068 # 01 Y:2011 01 2011 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $15,000 $300,000 Not Implemented
LE0314 # 01 Y:2011 01 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,497 $12,000 Not Implemented
LE0314 # 02 Y:2011 02 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $11,409 $580 Implemented
LE0314 # 03 Y:2011 03 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,295 $15,000 Not Implemented
LE0314 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,832 $1,420 Implemented
LE0314 # 05 Y:2011 05 2011 INSULATE BARE EQUIPMENT $4,063 $8,007 Not Implemented
LE0314 # 06 Y:2011 06 2011 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $1,532 $0 Implemented
LE0314 # 07 Y:2011 07 2011 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,127 $7,000 Not Implemented
LE0314 # 08 Y:2011 08 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,017 $39,066 Not Implemented
LL0339 # 01 Y:2010 01 2010 REPAIR AND ELIMINATE STEAM LEAKS $271,505 $2,920 Implemented
LL0339 # 02 Y:2010 02 2010 INCREASE AMOUNT OF CONDENSATE RETURNED $204,298 $966,460 Implemented
LL0339 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $152,895 $42,400 Implemented
LL0339 # 04 Y:2010 04 2010 INSULATE BARE EQUIPMENT $31,760 $6,240 Not Implemented
LL0339 # 05 Y:2010 05 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,510 $10,605 Not Implemented
LL0339 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,365 $1,950 Not Implemented
LL0339 # 07 Y:2010 07 2010 INSTALL OCCUPANCY SENSORS $3,388 $1,950 Not Implemented