Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
28
matching recommendationsNAICS | 32191 | Millwork |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0739 # 01 Y:2021 | 01 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,888 | $0 | Implemented |
OR0739 # 03 Y:2021 | 03 | 2021 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $11,419 | $32,321 | Not Implemented |
OR0739 # 02 Y:2021 | 02 | 2021 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $12,852 | $1,794 | Not Implemented |
LS2113 # 06 Y:2021 | 06 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,512 | $6,847 | Implemented |
LS2113 # 05 Y:2021 | 05 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $40,876 | $16,200 | Not Implemented |
LS2113 # 04 Y:2021 | 04 | 2021 | INSTALL OCCUPANCY SENSORS | $2,236 | $646 | Not Implemented |
LS2113 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,491 | $585 | Implemented |
LS2113 # 02 Y:2021 | 02 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,312 | $318 | Not Implemented |
LS2113 # 01 Y:2021 | 01 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,608 | $50 | Not Implemented |
LE0511 # 02 Y:2021 | 02 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,197 | $14,875 | Implemented |
LE0511 # 07 Y:2021 | 07 | 2021 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $1,243 | $6,000 | Not Implemented |
LE0511 # 06 Y:2021 | 06 | 2021 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $3,092 | $12,000 | Not Implemented |
LE0511 # 05 Y:2021 | 05 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $289 | $1,000 | Not Implemented |
LE0511 # 04 Y:2021 | 04 | 2021 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $2,375 | $7,600 | Not Implemented |
LE0511 # 03 Y:2021 | 03 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,917 | $8,000 | Not Implemented |
LE0511 # 01 Y:2021 | 01 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $824 | $35 | Not Implemented |
GT0955 # 01 Y:2021 | 01 | 2021 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $7,515 | $2,000 | Not Implemented |
GT0955 # 06 Y:2021 | 06 | 2021 | USE SOLAR HEAT TO MAKE ELECTRICTY | $70,408 | $429,498 | Not Implemented |
GT0955 # 05 Y:2021 | 05 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,445 | $4,419 | Implemented |
GT0955 # 04 Y:2021 | 04 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $295 | $477 | Not Implemented |
GT0955 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,967 | $1,850 | Implemented |
GT0955 # 02 Y:2021 | 02 | 2021 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $5,146 | $2,000 | Implemented |
LE0501 # 05 Y:2021 | 05 | 2021 | LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION | $534 | $1,240 | Not Implemented |
LE0501 # 03 Y:2021 | 03 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $560 | $500 | Implemented |
LE0501 # 02 Y:2021 | 02 | 2021 | INSTALL TIMERS AND/OR THERMOSTATS | $985 | $100 | Implemented |