IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,971

matching recommendations
Reset
NAICS 322 Paper Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0524 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,133 $7,750 Implemented
LE0524 # 04 Y:2022 04 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,786 $5,740 Not Implemented
LE0524 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $29,876 $25,340 Not Implemented
LE0524 # 06 Y:2022 06 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,341 $2,100 Not Implemented
LE0524 # 07 Y:2022 07 2022 INCREASE AMOUNT OF CONDENSATE RETURNED $247,341 $500,000 Not Implemented
LE0524 # 08 Y:2022 08 2022 ELIMINATE A BY-PRODUCT $1,467,534 $3,000,000 Not Implemented
LE0524 # 09 Y:2022 09 2022 INCREASE AMOUNT OF CONDENSATE RETURNED $166,416 $500,000 Not Implemented
LE0524 # 10 Y:2022 10 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,992 $24,000 Not Implemented
LE0524 # 11 Y:2022 11 2022 REPLACE BOILER $461,406 $4,000,000 Implemented
MA0828 # 01 Y:2022 01 2022 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $443,207 $3,043,367 Not Implemented
MA0828 # 02 Y:2022 02 2022 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $127,245 $144,842 Not Implemented
MA0828 # 03 Y:2022 03 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $64,198 $280,195 Not Implemented
MA0828 # 04 Y:2022 04 2022 RECOVER WASTE HEAT FROM EQUIPMENT $29,256 $3,515 Not Implemented
MA0828 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,386 $12,000 Not Implemented
MA0828 # 06 Y:2022 06 2022 INSULATE BARE EQUIPMENT $522 $910 Not Implemented
LE0512 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,383 $4,000 Implemented
LE0512 # 02 Y:2021 02 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,168 $4,000 Implemented
LE0512 # 03 Y:2021 03 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,086 $1,700 Not Implemented
LE0512 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,146 $7,700 Implemented
LE0512 # 05 Y:2021 05 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $460,500 $3,500,000 Implemented
NC0665 # 01 Y:2021 01 2021 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,027 $0 n/a
NC0665 # 02 Y:2021 02 2021 RECOVER WASTE HEAT FROM EQUIPMENT $1,072 $1,000 n/a
NC0665 # 03 Y:2021 03 2021 RECOVER WASTE HEAT FROM EQUIPMENT $5,642 $2,000 n/a
IP0145 # 01 Y:2021 01 2021 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $88,444 $27,000 Not Implemented
IP0145 # 02 Y:2021 02 2021 UPGRADE CONTROLS ON COMPRESSORS $24,768 $21,741 Not Implemented