IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

188

matching recommendations
Reset
NAICS 32213 Paperboard Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0401 # 09 Y:2010 09 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,622 $312 Implemented
WV0401 # 10 Y:2010 10 2010 IMPROVE LUBRICATION PRACTICES $3,683 $858 Not Implemented
WV0401 # 11 Y:2010 11 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,378 $936 Not Implemented
WV0401 # 12 Y:2010 12 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,182 $2,886 Implemented
WV0401 # 13 Y:2010 13 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,239 $1,000 Implemented
WV0401 # 14 Y:2010 14 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $536 $52 Implemented
WV0396 # 01 Y:2009 01 2009 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $404,150 $744,800 Not Implemented
WV0396 # 02 Y:2009 02 2009 USE MINIMUM STEAM OPERATING PRESSURE $80,973 $54,000 Not Implemented
WV0396 # 03 Y:2009 03 2009 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $72,044 $295,680 Not Implemented
WV0396 # 04 Y:2009 04 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $69,637 $1,000 Implemented
WV0396 # 05 Y:2009 05 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $10,128 $3,390 Implemented
WV0396 # 06 Y:2009 06 2009 DEVELOP A REPAIR/REPLACE POLICY $9,954 $1,094 Implemented
WV0396 # 07 Y:2009 07 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,556 $10,996 Not Implemented
WV0396 # 08 Y:2009 08 2009 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $8,609 $1,000 Implemented
WV0396 # 09 Y:2009 09 2009 OPTIMIZE PLANT POWER FACTOR $7,614 $28,000 Not Implemented
WV0396 # 10 Y:2009 10 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,796 $263 Implemented
WV0396 # 11 Y:2009 11 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,630 $445 Not Implemented
WV0396 # 12 Y:2009 12 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $846 $50 Implemented
WV0396 # 13 Y:2009 13 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $829 $0 Implemented
WV0396 # 14 Y:2009 14 2009 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $781 $575 Implemented
UM0341 # 01 Y:2008 01 2008 INSULATE BARE EQUIPMENT $101,548 $18,088 Not Implemented
UM0341 # 02 Y:2008 02 2008 INSULATE BARE EQUIPMENT $79,804 $53,414 Implemented
UM0341 # 03 Y:2008 03 2008 RECOVER WASTE HEAT FROM EQUIPMENT $31,965 $59,142 Not Implemented
UM0341 # 04 Y:2008 04 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,835 $4,800 Not Implemented
UM0341 # 05 Y:2008 05 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,572 $5,000 Not Implemented