IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
NAICS 3222 Converted Paper Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0688 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,165 $0 Not Implemented
OR0688 # 01 Y:2017 01 2017 RECOVER WASTE HEAT FROM EQUIPMENT $3,431 $448 Implemented
OR0688 # 02 Y:2017 02 2017 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $9,221 $180,000 Implemented
OR0688 # 03 Y:2017 03 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,049 $0 Not Implemented
OR0675 # 04 Y:2016 04 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,199 $7,215 Not Implemented
OR0675 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,809 $23,810 Implemented
OR0675 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $31,062 $1,969 Implemented
OR0675 # 01 Y:2016 01 2016 INSTALL EQUIPMENT TO MOVE PRODUCT $79,123 $89,654 Implemented
UW0046 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $1,735 $1,160 Not Implemented
UW0046 # 02 Y:2011 02 2011 REPLACE BOILER $38,030 $90,000 Not Implemented
UW0046 # 01 Y:2011 01 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $44,504 $330 Not Implemented
UW0040 # 01 Y:2010 01 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $977,184 $420,000 Implemented
UW0040 # 02 Y:2010 02 2010 KEEP BOILER TUBES CLEAN $82,215 $50,000 Implemented
UW0040 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,477 $32,020 Not Implemented
UW0027 # 01 Y:2009 01 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,632 $10,324 Not Implemented
UW0027 # 02 Y:2009 02 2009 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $6,650 $37,000 Not Implemented
UW0027 # 03 Y:2009 03 2009 INSULATE BARE EQUIPMENT $5,716 $871 Not Implemented
UW0027 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,168 $2,280 Implemented
UW0027 # 05 Y:2009 05 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $144 $0 Implemented
UW0006 # 07 Y:2007 07 2007 USE SOLAR HEAT TO HEAT WATER $1,600 $4,450 Not Implemented
UW0006 # 06 Y:2007 06 2007 INSTALL OCCUPANCY SENSORS $2,289 $3,340 Implemented
UW0006 # 05 Y:2007 05 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,403 $4,470 Implemented
UW0006 # 04 Y:2007 04 2007 OPTIMIZE PLANT POWER FACTOR $3,834 $12,330 Not Implemented
UW0006 # 03 Y:2007 03 2007 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $6,191 $10,550 Not Implemented
UW0006 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,096 $1,900 Implemented