IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

64

matching recommendations
Reset
NAICS 32221 Paperboard Container Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0218 # 05 Y:2023 05 2023 RECOVER WASTE HEAT FROM EQUIPMENT $11,159 $10,000 Implemented
DL0218 # 01 Y:2023 01 2023 REDUCE VENTILATION AIR $11,809 $0 Implemented
DL0218 # 03 Y:2023 03 2023 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $3,402 $750 Implemented
DL0218 # 02 Y:2023 02 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $90,882 $0 Implemented
LE0434 # 01 Y:2017 01 2017 INSTALL TIMERS AND/OR THERMOSTATS $1,784 $28 Implemented
LE0434 # 03 Y:2017 03 2017 RECOVER WASTE HEAT FROM EQUIPMENT $2,560 $1,080 Implemented
LE0434 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $483 $1,450 Implemented
LE0397 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,221 $10,086 Implemented
LE0397 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $116 $1,914 Implemented
LE0397 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,396 $1,000 Implemented
LE0336 # 08 Y:2012 08 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,616 $650 Implemented
LE0336 # 07 Y:2012 07 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,762 $25 Implemented
LE0336 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,173 $1,000 Implemented
LE0336 # 03 Y:2012 03 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,242 $16,000 Implemented
LE0336 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,734 $8,000 Implemented
LE0336 # 06 Y:2012 06 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,840 $3,000 Implemented
LE0336 # 01 Y:2012 01 2012 INSTALL TIMERS AND/OR THERMOSTATS $18,760 $150 Implemented
LE0303 # 02 Y:2010 02 2010 INSTALL TIMERS AND/OR THERMOSTATS $10,520 $650 Implemented
LE0303 # 10 Y:2010 10 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,131 $15 Implemented
LE0303 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $26,348 $1,672 Implemented
LE0303 # 11 Y:2010 11 2010 RECOVER WASTE HEAT FROM EQUIPMENT $973 $1,000 Implemented
LE0303 # 09 Y:2010 09 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,351 $800 Implemented
LE0270 # 08 Y:2008 08 2008 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,349 $175,000 Implemented
LE0270 # 09 Y:2008 09 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,061 $1,350 Implemented
LE0270 # 10 Y:2008 10 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,558 $11,908 Implemented