Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
148
matching recommendationsNAICS | 32221 | Paperboard Container Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0218 # 04 Y:2023 | 04 | 2023 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $10,992 | $10,000 | Not Implemented |
DL0218 # 05 Y:2023 | 05 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,159 | $10,000 | Implemented |
DL0218 # 02 Y:2023 | 02 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $90,882 | $0 | Implemented |
DL0218 # 06 Y:2023 | 06 | 2023 | INSTALL SET-BACK TIMERS | $473 | $1,000 | Not Implemented |
DL0218 # 03 Y:2023 | 03 | 2023 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $3,402 | $750 | Implemented |
DL0218 # 01 Y:2023 | 01 | 2023 | REDUCE VENTILATION AIR | $11,809 | $0 | Implemented |
LE0434 # 07 Y:2017 | 07 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $483 | $1,450 | Implemented |
LE0434 # 04 Y:2017 | 04 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $576 | $300 | Not Implemented |
LE0434 # 03 Y:2017 | 03 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,560 | $1,080 | Implemented |
LE0434 # 08 Y:2017 | 08 | 2017 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $9,523 | $40,000 | Not Implemented |
LE0434 # 01 Y:2017 | 01 | 2017 | INSTALL TIMERS AND/OR THERMOSTATS | $1,784 | $28 | Implemented |
LE0434 # 05 Y:2017 | 05 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $25,921 | $65,000 | Not Implemented |
LE0434 # 06 Y:2017 | 06 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,129 | $5,350 | Not Implemented |
LE0434 # 02 Y:2017 | 02 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,031 | $1,000 | Not Implemented |
DL0150 # 02 Y:2015 | 02 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,920 | $500 | Not Implemented |
DL0150 # 07 Y:2015 | 07 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,720 | $18,100 | Not Implemented |
DL0150 # 01 Y:2015 | 01 | 2015 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $780 | $0 | Not Implemented |
DL0150 # 05 Y:2015 | 05 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,075 | $19,740 | Not Implemented |
DL0150 # 08 Y:2015 | 08 | 2015 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $7,020 | $58,500 | Not Implemented |
DL0150 # 06 Y:2015 | 06 | 2015 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $13,240 | $62,400 | Not Implemented |
DL0150 # 04 Y:2015 | 04 | 2015 | INSTALL REPLACEMENT DOORS | $2,450 | $7,800 | Not Implemented |
DL0150 # 03 Y:2015 | 03 | 2015 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $760 | $560 | Not Implemented |
LE0397 # 05 Y:2015 | 05 | 2015 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,917 | $14,900 | Not Implemented |
LE0397 # 06 Y:2015 | 06 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $116 | $1,914 | Implemented |
LE0397 # 04 Y:2015 | 04 | 2015 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $2,238 | $5,500 | Not Implemented |