Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
26
matching recommendationsNAICS | 322211 | Corrugated and Solid Fiber Box Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0964 # 09 Y:2017 | 09 | 2017 | INSTALL SPECTRAL REFLECTORS / DELAMP | $6,075 | $0 | Not Implemented |
UD0964 # 08 Y:2017 | 08 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,225 | $21,449 | Not Implemented |
UD0964 # 07 Y:2017 | 07 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $31,348 | $36,424 | Not Implemented |
UD0964 # 06 Y:2017 | 06 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,522 | $0 | Not Implemented |
UD0964 # 05 Y:2017 | 05 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,749 | $2,840 | Not Implemented |
UD0964 # 04 Y:2017 | 04 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,000 | $1,000 | Not Implemented |
UD0964 # 03 Y:2017 | 03 | 2017 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $5,847 | $500 | Not Implemented |
UD0964 # 02 Y:2017 | 02 | 2017 | USE OPTIMUM TEMPERATURE | $652 | $500 | Not Implemented |
UD0964 # 01 Y:2017 | 01 | 2017 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $6,083 | $0 | Not Implemented |
UD0804 # 14 Y:2009 | 14 | 2009 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,920 | $1,000 | Not Implemented |
UD0804 # 17 Y:2009 | 17 | 2009 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $270 | $500 | Not Implemented |
UD0804 # 16 Y:2009 | 16 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,160 | $2,094 | Not Implemented |
UD0804 # 15 Y:2009 | 15 | 2009 | ISOLATE HOT OR COLD EQUIPMENT | $1,306 | $0 | Implemented |
UD0804 # 01 Y:2009 | 01 | 2009 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $49,362 | $48,000 | Not Implemented |
UD0804 # 13 Y:2009 | 13 | 2009 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,560 | $0 | Not Implemented |
UD0804 # 12 Y:2009 | 12 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,004 | $12,597 | Not Implemented |
UD0804 # 11 Y:2009 | 11 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,128 | $0 | Implemented |
UD0804 # 10 Y:2009 | 10 | 2009 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,963 | $2,000 | Not Implemented |
UD0804 # 09 Y:2009 | 09 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,589 | $5,523 | Not Implemented |
UD0804 # 08 Y:2009 | 08 | 2009 | KEEP BOILER TUBES CLEAN | $8,490 | $600 | Implemented |
UD0804 # 07 Y:2009 | 07 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,414 | $30,134 | Not Implemented |
UD0804 # 06 Y:2009 | 06 | 2009 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $10,661 | $6,000 | Not Implemented |
UD0804 # 05 Y:2009 | 05 | 2009 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $17,277 | $500 | Implemented |
UD0804 # 04 Y:2009 | 04 | 2009 | REPAIR OR REPLACE STEAM TRAPS | $23,089 | $4,000 | Implemented |
UD0804 # 03 Y:2009 | 03 | 2009 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $35,001 | $9,000 | Implemented |