IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
Reset
NAICS 322212 Folding Paperboard Box Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0662 # 02 Y:2025 02 2025 USE BATTERY STORAGE FOR DEMAND CONTROL $291,442 $26,842 n/a
SD0662 # 01 Y:2025 01 2025 USE SOLAR HEAT TO MAKE ELECTRICTY $78,473 $158,282 n/a
SD0662 # 10 Y:2025 10 2025 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $167,076 $0 n/a
SD0662 # 09 Y:2025 09 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,422 $2,278 n/a
SD0662 # 08 Y:2025 08 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,646 $15,968 n/a
SD0662 # 07 Y:2025 07 2025 TURN OFF EQUIPMENT WHEN NOT IN USE $30,392 $3,600 n/a
SD0662 # 06 Y:2025 06 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,545 $8,505 n/a
SD0662 # 05 Y:2025 05 2025 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,635 $3,345 n/a
SD0662 # 04 Y:2025 04 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $40,111 $7,839 n/a
SD0662 # 03 Y:2025 03 2025 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $1,617 $2,200 n/a
SF0438 # 11 Y:2013 11 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,005 $10,308 Not Implemented
SF0438 # 10 Y:2013 10 2013 INSTALL OCCUPANCY SENSORS $2,748 $8,715 Not Implemented
SF0438 # 09 Y:2013 09 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $799 $2,008 Not Implemented
SF0438 # 08 Y:2013 08 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,281 $7,509 Not Implemented
SF0438 # 07 Y:2013 07 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,126 $11,332 Not Implemented
SF0438 # 06 Y:2013 06 2013 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $4,153 $5,267 Implemented
SF0438 # 05 Y:2013 05 2013 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $3,906 $4,995 Implemented
SF0438 # 04 Y:2013 04 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $176 $105 Implemented
SF0438 # 03 Y:2013 03 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,090 $4,441 Implemented
SF0438 # 02 Y:2013 02 2013 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $4,345 $2,494 Implemented
SF0438 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,414 $840 Implemented
SF0375 # 10 Y:2009 10 2009 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $9,983 $67,481 Implemented
SF0375 # 09 Y:2009 09 2009 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,842 $12,018 Implemented
SF0375 # 08 Y:2009 08 2009 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $191 $945 Not Implemented
SF0375 # 07 Y:2009 07 2009 INSTALL OCCUPANCY SENSORS $10,418 $41,832 Implemented