IAC logo
IAC Assessment: SF0375
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0375
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2009
Principal Product Cardboard Boxes
NAICS 322212 - Folding Paperboard Box Manufacturing
SIC 2657 - Folding Paperboard Boxes
Sales $100,000,000-$500,000,000
# of Employees 345
Plant Area (Sq.Ft.) 520,000
Annual Production 1 Units
Production Hrs. Annual 8,736
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,159,474 11,479,838 kWh $0.10
Electricity Demand $435,656 2,600 kW-months/year $167.56
Electricity Fees $15,085 - $ -
Natural Gas $99,033 8,254 MMBtu $12.00
TOTAL ENERGY COSTS $1,709,248
RECOMMENDED SAVINGS* $167,451 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $105,019
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,246
Cost:
-
$3,246 58,184 - - - - $3,246
58,184
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,383
Cost:
$460
- - - - $2,383 199 -
-
kWh
-
-
kW-months/year
$2,383
199
MMBtu
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$34,176
Cost:
$37,453
$34,176 501,330 - - - - $34,176
501,330
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$26,893
Cost:
$32,381
$19,298 283,080 $7,595 504 - - $19,298
283,080
kWh
$7,595
504
kW-months/year
-
-
MMBtu
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$1,172
Cost:
$3,307
$1,172 17,188 - - - - $1,172
17,188
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$75,147
Cost:
$244,092
$53,813 789,387 $21,334 1,416 - - $53,813
789,387
kWh
$21,334
1,416
kW-months/year
-
-
MMBtu
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$10,418
Cost:
$41,832
$10,418 109,663 - - - - $10,418
109,663
kWh
-
-
kW-months/year
-
-
MMBtu
08: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$191
Cost:
$945
$191 2,797 - - - - $191
2,797
kWh
-
-
kW-months/year
-
-
MMBtu
09: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$3,842
Cost:
$12,018
$2,757 40,440 $1,085 72 - - $2,757
40,440
kWh
$1,085
72
kW-months/year
-
-
MMBtu
10: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$9,983
Cost:
$67,481
$1,212 17,795 $648 43 $8,123 677 $1,212
17,795
kWh
$648
43
kW-months/year
$8,123
677
MMBtu
TOTAL RECOMMENDED Savings:
$167,451
Cost:
$439,969
$126,283 1,819,864 $30,662 2,035 $10,506 876 $126,283
1,819,864
kWh
$30,662
2,035
kW-months/year
$10,506
876
MMBtu
TOTAL IMPLEMENTED Savings:
$105,019
Cost:
$365,883
$71,446 1,015,469 $23,067 1,531 $10,506 876 $71,446
1,015,469
kWh
$23,067
1,531
kW-months/year
$10,506
876
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas