IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

338

matching recommendations
Reset
NAICS 322212 Folding Paperboard Box Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0397 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,396 $1,000 Implemented
LE0397 # 04 Y:2015 04 2015 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,238 $5,500 Not Implemented
LE0397 # 05 Y:2015 05 2015 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,917 $14,900 Not Implemented
LE0397 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $116 $1,914 Implemented
NC0520 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,324 $400 Implemented
NC0520 # 09 Y:2014 09 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,603 $200 Implemented
NC0520 # 08 Y:2014 08 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,173 $23 Not Implemented
NC0520 # 07 Y:2014 07 2014 DEVELOP A REPAIR/REPLACE POLICY $3,912 $8,146 Not Implemented
NC0520 # 06 Y:2014 06 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,992 $100 Implemented
NC0520 # 04 Y:2014 04 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,255 $413 Implemented
NC0520 # 03 Y:2014 03 2014 INSTALL OCCUPANCY SENSORS $2,633 $5,706 Implemented
NC0520 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,056 $22,494 Implemented
NC0520 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,219 $80,659 Implemented
IP0019 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,889 $3,258 Implemented
IP0019 # 07 Y:2013 07 2013 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $640 $957 Not Implemented
IP0019 # 01 Y:2013 01 2013 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,290 $0 Not Implemented
IP0019 # 02 Y:2013 02 2013 APPLY FOR INVESTMENT INCENTIVES $166 $0 Not Implemented
IP0019 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,885 $164 Implemented
IP0019 # 05 Y:2013 05 2013 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT $668 $715 Not Implemented
IP0019 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $493 $0 Implemented
SF0438 # 08 Y:2013 08 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,281 $7,509 Not Implemented
SF0438 # 07 Y:2013 07 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,126 $11,332 Not Implemented
SF0438 # 06 Y:2013 06 2013 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $4,153 $5,267 Implemented
SF0438 # 05 Y:2013 05 2013 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $3,906 $4,995 Implemented
SF0438 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,414 $840 Implemented