Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
25
matching recommendationsNAICS | 322219 | Other Paperboard Container Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0218 # 06 Y:2023 | 06 | 2023 | INSTALL SET-BACK TIMERS | $473 | $1,000 | Not Implemented |
DL0218 # 05 Y:2023 | 05 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,159 | $10,000 | Implemented |
DL0218 # 04 Y:2023 | 04 | 2023 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $10,992 | $10,000 | Not Implemented |
DL0218 # 03 Y:2023 | 03 | 2023 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $3,402 | $750 | Implemented |
DL0218 # 02 Y:2023 | 02 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $90,882 | $0 | Implemented |
DL0218 # 01 Y:2023 | 01 | 2023 | REDUCE VENTILATION AIR | $11,809 | $0 | Implemented |
DL0150 # 02 Y:2015 | 02 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,920 | $500 | Not Implemented |
DL0150 # 07 Y:2015 | 07 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,720 | $18,100 | Not Implemented |
DL0150 # 06 Y:2015 | 06 | 2015 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $13,240 | $62,400 | Not Implemented |
DL0150 # 05 Y:2015 | 05 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,075 | $19,740 | Not Implemented |
DL0150 # 04 Y:2015 | 04 | 2015 | INSTALL REPLACEMENT DOORS | $2,450 | $7,800 | Not Implemented |
DL0150 # 03 Y:2015 | 03 | 2015 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $760 | $560 | Not Implemented |
DL0150 # 01 Y:2015 | 01 | 2015 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $780 | $0 | Not Implemented |
DL0150 # 08 Y:2015 | 08 | 2015 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $7,020 | $58,500 | Not Implemented |
LE0229 # 11 Y:2006 | 11 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,100 | $4,218 | Not Implemented |
LE0229 # 10 Y:2006 | 10 | 2006 | INSTALL OCCUPANCY SENSORS | $5,318 | $525 | Not Implemented |
LE0229 # 09 Y:2006 | 09 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,780 | $1,000 | Implemented |
LE0229 # 08 Y:2006 | 08 | 2006 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,528 | $2,500 | Not Implemented |
LE0229 # 07 Y:2006 | 07 | 2006 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,542 | $2,100 | Not Implemented |
LE0229 # 06 Y:2006 | 06 | 2006 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $6,898 | $316 | Not Implemented |
LE0229 # 05 Y:2006 | 05 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,981 | $500 | Implemented |
LE0229 # 04 Y:2006 | 04 | 2006 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $16,904 | $34,000 | Implemented |
LE0229 # 03 Y:2006 | 03 | 2006 | RECYCLE WASTE INK AND CLEANUP SOLVENT | $36,000 | $50,000 | Implemented |
LE0229 # 02 Y:2006 | 02 | 2006 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $64,670 | $27,200 | Implemented |
LE0229 # 01 Y:2006 | 01 | 2006 | REDESIGN PROCESS | $80,430 | $30,000 | Not Implemented |