Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
444
matching recommendationsNAICS | 32222 | Paper Bag and Coated and Treated Paper Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0367 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $852 | $400 | n/a |
MZ0367 # 05 Y:2024 | 05 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,969 | $3,120 | n/a |
MZ0367 # 02 Y:2024 | 02 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,464 | $5,400 | n/a |
MZ0367 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,987 | $1,000 | n/a |
MZ0367 # 03 Y:2024 | 03 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $16,498 | $12,000 | n/a |
LE0542 # 04 Y:2023 | 04 | 2023 | OPTIMIZE PLANT POWER FACTOR | $5,492 | $12,810 | Implemented |
LE0542 # 01 Y:2023 | 01 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,677 | $3,000 | Not Implemented |
LE0542 # 05 Y:2023 | 05 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,898 | $60,000 | Not Implemented |
LE0542 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $26,690 | $37,053 | Not Implemented |
LE0542 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,207 | $1,900 | Implemented |
CC0007 # 06 Y:2022 | 06 | 2022 | INSULATE BARE EQUIPMENT | $3,056 | $8,000 | n/a |
CC0007 # 07 Y:2022 | 07 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,680 | $40,000 | n/a |
CC0007 # 09 Y:2022 | 09 | 2022 | REPAIR AND ELIMINATE STEAM LEAKS | $8,453 | $500 | n/a |
CC0007 # 08 Y:2022 | 08 | 2022 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $15,506 | $58,000 | n/a |
CC0007 # 01 Y:2022 | 01 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,092 | $17,800 | n/a |
CC0007 # 03 Y:2022 | 03 | 2022 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $364 | $0 | n/a |
CC0007 # 05 Y:2022 | 05 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,005 | $1,000 | n/a |
CC0007 # 02 Y:2022 | 02 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,936 | $4,400 | n/a |
CC0007 # 04 Y:2022 | 04 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,805 | $18,800 | n/a |
SU0503 # 02 Y:2021 | 02 | 2021 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $30 | $0 | Not Implemented |
SU0503 # 03 Y:2021 | 03 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,156 | $40 | Not Implemented |
SU0503 # 01 Y:2021 | 01 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,396 | $0 | Implemented |
SU0503 # 04 Y:2021 | 04 | 2021 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $945 | $340 | Not Implemented |
SU0503 # 05 Y:2021 | 05 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $579 | $155 | Implemented |
SU0503 # 06 Y:2021 | 06 | 2021 | INSTALL OCCUPANCY SENSORS | $142 | $176 | Implemented |