Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
NAICS 32222 Paper Bag and Coated and Treated Paper Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0503 # 09 Y:2021 09 2021 ELIMINATE/REDUCE AN OPERATION $840 $2,772 Not Implemented
SU0503 # 08 Y:2021 08 2021 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $79 $186 Not Implemented
SU0503 # 07 Y:2021 07 2021 REDUCE VENTILATION AIR $1,358 $1,749 Not Implemented
SU0503 # 06 Y:2021 06 2021 INSTALL OCCUPANCY SENSORS $142 $176 Implemented
SU0503 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $579 $155 Implemented
SU0503 # 04 Y:2021 04 2021 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $945 $340 Not Implemented
SU0503 # 03 Y:2021 03 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,156 $40 Not Implemented
SU0503 # 02 Y:2021 02 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $30 $0 Not Implemented
SU0503 # 01 Y:2021 01 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,396 $0 Implemented
SU0251 # 12 Y:2007 12 2007 INSTALL OCCUPANCY SENSORS $1,778 $1,620 Not Implemented
SU0251 # 14 Y:2007 14 2007 OPTIMIZE PLANT POWER FACTOR $3,906 $14,129 Not Implemented
SU0251 # 13 Y:2007 13 2007 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,970 $2,556 Implemented
SU0251 # 01 Y:2007 01 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,054 $0 Not Implemented
SU0251 # 11 Y:2007 11 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $234 $150 Not Implemented
SU0251 # 10 Y:2007 10 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $278 $130 Not Implemented
SU0251 # 09 Y:2007 09 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,026 $5,000 Implemented
SU0251 # 08 Y:2007 08 2007 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $38,999 $17,176 Not Implemented
SU0251 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,420 $8,140 Implemented
SU0251 # 06 Y:2007 06 2007 REPAIR OR REPLACE STEAM TRAPS $2,314 $219 Implemented
SU0251 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,670 $480 Implemented
SU0251 # 04 Y:2007 04 2007 INSTALL SET-BACK TIMERS $8,210 $457 Not Implemented
SU0251 # 03 Y:2007 03 2007 USE SYNTHETIC LUBRICANT $707 $0 Not Implemented
SU0251 # 02 Y:2007 02 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,682 $0 Implemented