Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
38
matching recommendationsNAICS | 32222 | Paper Bag and Coated and Treated Paper Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0605 # 02 Y:2007 | 02 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $50,860 | $81,340 | Not Implemented |
CO0605 # 03 Y:2007 | 03 | 2007 | USE SOLAR HEAT TO MAKE ELECTRICTY | $5,400 | $61,600 | Not Implemented |
CO0605 # 04 Y:2007 | 04 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,140 | $5,070 | Not Implemented |
CO0605 # 05 Y:2007 | 05 | 2007 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,040 | $7,200 | Not Implemented |
CO0605 # 06 Y:2007 | 06 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $430 | $2,030 | Not Implemented |
CO0605 # 01 Y:2007 | 01 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,260 | $29,000 | Not Implemented |
LE0256 # 08 Y:2007 | 08 | 2007 | INSTALL OCCUPANCY SENSORS | $1,207 | $1,200 | Not Implemented |
LE0256 # 09 Y:2007 | 09 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,990 | $11,733 | Not Implemented |
LE0256 # 07 Y:2007 | 07 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $689 | $500 | Not Implemented |
LE0256 # 06 Y:2007 | 06 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,217 | $500 | Implemented |
LE0256 # 05 Y:2007 | 05 | 2007 | USE RADIANT HEATER FOR SPOT HEATING | $4,138 | $5,000 | Not Implemented |
LE0256 # 04 Y:2007 | 04 | 2007 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $7,965 | $35,200 | Implemented |
LE0256 # 03 Y:2007 | 03 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,536 | $15,000 | Not Implemented |
LE0256 # 02 Y:2007 | 02 | 2007 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $15,602 | $5,000 | Not Implemented |
LE0256 # 01 Y:2007 | 01 | 2007 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $101,767 | $50,000 | Not Implemented |
SU0251 # 06 Y:2007 | 06 | 2007 | REPAIR OR REPLACE STEAM TRAPS | $2,314 | $219 | Implemented |
SU0251 # 05 Y:2007 | 05 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,670 | $480 | Implemented |
SU0251 # 08 Y:2007 | 08 | 2007 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $38,999 | $17,176 | Not Implemented |
SU0251 # 10 Y:2007 | 10 | 2007 | INSTALL / REPAIR INSULATION ON STEAM LINES | $278 | $130 | Not Implemented |
SU0251 # 09 Y:2007 | 09 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $14,026 | $5,000 | Implemented |
SU0251 # 07 Y:2007 | 07 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $41,420 | $8,140 | Implemented |
SU0251 # 04 Y:2007 | 04 | 2007 | INSTALL SET-BACK TIMERS | $8,210 | $457 | Not Implemented |
SU0251 # 14 Y:2007 | 14 | 2007 | OPTIMIZE PLANT POWER FACTOR | $3,906 | $14,129 | Not Implemented |
SU0251 # 03 Y:2007 | 03 | 2007 | USE SYNTHETIC LUBRICANT | $707 | $0 | Not Implemented |
SU0251 # 01 Y:2007 | 01 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,054 | $0 | Not Implemented |