IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

444

matching recommendations
Reset
NAICS 322220 Paper Bag and Coated and Treated Paper Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0367 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $852 $400 n/a
MZ0367 # 05 Y:2024 05 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,969 $3,120 n/a
MZ0367 # 02 Y:2024 02 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,464 $5,400 n/a
MZ0367 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,987 $1,000 n/a
MZ0367 # 03 Y:2024 03 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $16,498 $12,000 n/a
LE0542 # 04 Y:2023 04 2023 OPTIMIZE PLANT POWER FACTOR $5,492 $12,810 Implemented
LE0542 # 01 Y:2023 01 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,677 $3,000 Not Implemented
LE0542 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,898 $60,000 Not Implemented
LE0542 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,690 $37,053 Not Implemented
LE0542 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,207 $1,900 Implemented
CC0007 # 06 Y:2022 06 2022 INSULATE BARE EQUIPMENT $3,056 $8,000 n/a
CC0007 # 07 Y:2022 07 2022 RECOVER WASTE HEAT FROM EQUIPMENT $10,680 $40,000 n/a
CC0007 # 09 Y:2022 09 2022 REPAIR AND ELIMINATE STEAM LEAKS $8,453 $500 n/a
CC0007 # 08 Y:2022 08 2022 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $15,506 $58,000 n/a
CC0007 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,092 $17,800 n/a
CC0007 # 03 Y:2022 03 2022 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $364 $0 n/a
CC0007 # 05 Y:2022 05 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,005 $1,000 n/a
CC0007 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,936 $4,400 n/a
CC0007 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,805 $18,800 n/a
SU0503 # 02 Y:2021 02 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $30 $0 Not Implemented
SU0503 # 03 Y:2021 03 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,156 $40 Not Implemented
SU0503 # 01 Y:2021 01 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,396 $0 Implemented
SU0503 # 04 Y:2021 04 2021 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $945 $340 Not Implemented
SU0503 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $579 $155 Implemented
SU0503 # 06 Y:2021 06 2021 INSTALL OCCUPANCY SENSORS $142 $176 Implemented