Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

153

matching recommendations
Reset
NAICS 32223 Stationery Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MAS019 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,186 $1,500 Implemented
SU0290 # 07 Y:2010 07 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,630 $486 Not Implemented
SU0290 # 01 Y:2010 01 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,822 $0 Implemented
SU0290 # 02 Y:2010 02 2010 DISCONNECT BALLASTS $2,268 $0 Implemented
SU0290 # 03 Y:2010 03 2010 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,483 $0 Not Implemented
SU0290 # 04 Y:2010 04 2010 USE SYNTHETIC LUBRICANT $190 $0 Not Implemented
SU0290 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,690 $200 Implemented
SU0290 # 06 Y:2010 06 2010 INSTALL OCCUPANCY SENSORS $739 $159 Not Implemented
SU0290 # 14 Y:2010 14 2010 OPTIMIZE PLANT POWER FACTOR $1,087 $6,486 Implemented
SU0290 # 13 Y:2010 13 2010 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $8,956 $20,410 Not Implemented
SU0290 # 11 Y:2010 11 2010 REDUCE VENTILATION AIR $7,633 $10,197 Implemented
SU0290 # 08 Y:2010 08 2010 INSTALL OCCUPANCY SENSORS $421 $357 Implemented
SU0290 # 12 Y:2010 12 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $139 $335 Implemented
SU0290 # 09 Y:2010 09 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $186 $268 Implemented
SU0290 # 10 Y:2010 10 2010 RECOVER WASTE HEAT FROM EQUIPMENT $11,876 $11,749 Not Implemented
AM0544 # 03 Y:2008 03 2008 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $16,810 $0 Implemented
AM0544 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,200 $42,370 Implemented
AM0544 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $26,350 $2,500 Implemented
AM0544 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $385 $0 Implemented
AM0544 # 06 Y:2008 06 2008 USE SYNTHETIC LUBRICANT $1,885 $0 Implemented
AM0544 # 04 Y:2008 04 2008 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $10,200 $24,000 Implemented
AM0544 # 07 Y:2008 07 2008 REUSE RAGS UNTIL COMPLETELY SOILED $1,040 $0 Implemented
AM0544 # 05 Y:2008 05 2008 PAY UTILITY BILLS ON TIME $6,800 $0 Implemented
UU0111 # 02 Y:2006 02 2006 INSTALL COMMON HEADER ON COMPRESSORS $1,760 $8,000 Not Implemented
UU0111 # 01 Y:2006 01 2006 USE DEMAND CONTROLLER OR LOAD SHEDDER $22,930 $20,000 Not Implemented