Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
138
matching recommendationsNAICS | 322299 | All Other Converted Paper Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NT0014 # 03 Y:2023 | 03 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $955 | $0 | n/a |
NT0014 # 05 Y:2023 | 05 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,512 | $0 | n/a |
NT0014 # 02 Y:2023 | 02 | 2023 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $6,006 | $6,160 | n/a |
NT0014 # 04 Y:2023 | 04 | 2023 | OPTIMIZE PLANT POWER FACTOR | $2,486 | $1,441 | n/a |
NT0014 # 01 Y:2023 | 01 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,483 | $1,258 | n/a |
UC2301 # 01 Y:2023 | 01 | 2023 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $19,647 | $0 | Not Implemented |
UC2301 # 06 Y:2023 | 06 | 2023 | AIR CONDITION ONLY SPACE NECESSARY | $1,959 | $1,200 | Not Implemented |
UC2301 # 07 Y:2023 | 07 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $21,858 | $127,920 | Not Implemented |
UC2301 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $552 | $2,800 | Not Implemented |
UC2301 # 05 Y:2023 | 05 | 2023 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $669 | $3,250 | Not Implemented |
UC2301 # 02 Y:2023 | 02 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $520 | $600 | Not Implemented |
UC2301 # 03 Y:2023 | 03 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $407 | $600 | Not Implemented |
IP0162 # 05 Y:2022 | 05 | 2022 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $45,478 | $37,072 | Implemented |
IP0162 # 07 Y:2022 | 07 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $923 | $2,186 | Implemented |
IP0162 # 06 Y:2022 | 06 | 2022 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $5,589 | $8,000 | Not Implemented |
IP0162 # 04 Y:2022 | 04 | 2022 | INSTALL OCCUPANCY SENSORS | $377 | $137 | Implemented |
IP0162 # 03 Y:2022 | 03 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $634 | $152 | Implemented |
IP0162 # 02 Y:2022 | 02 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,724 | $1,255 | Implemented |
IP0162 # 01 Y:2022 | 01 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,109 | $12 | Implemented |
NC0665 # 03 Y:2021 | 03 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,642 | $2,000 | n/a |
NC0665 # 02 Y:2021 | 02 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,072 | $1,000 | n/a |
NC0665 # 01 Y:2021 | 01 | 2021 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $6,027 | $0 | n/a |
SU0494 # 01 Y:2020 | 01 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $831 | $0 | Not Implemented |
SU0494 # 02 Y:2020 | 02 | 2020 | PAY BILLS ON TIME TO AVOID LATE FEES | $172 | $0 | Implemented |
SU0494 # 04 Y:2020 | 04 | 2020 | INSTALL OCCUPANCY SENSORS | $2,182 | $766 | Not Implemented |