Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
58
matching recommendationsNAICS | 32311 | Printing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0322 # 05 Y:2005 | 05 | 2005 | USE RADIANT HEATER FOR SPOT HEATING | $6,482 | $1,500 | Not Implemented |
WV0322 # 12 Y:2005 | 12 | 2005 | DEVELOP A REPAIR/REPLACE POLICY | $664 | $248 | Implemented |
WV0322 # 11 Y:2005 | 11 | 2005 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $687 | $250 | Implemented |
WV0322 # 10 Y:2005 | 10 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,114 | $330 | Not Implemented |
WV0322 # 08 Y:2005 | 08 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,978 | $525 | Implemented |
WV0322 # 07 Y:2005 | 07 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,341 | $0 | Implemented |
WV0322 # 06 Y:2005 | 06 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,038 | $15,738 | Implemented |
WV0322 # 09 Y:2005 | 09 | 2005 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,045 | $160 | Not Implemented |
WV0322 # 04 Y:2005 | 04 | 2005 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $8,249 | $9,180 | Not Implemented |
WV0322 # 03 Y:2005 | 03 | 2005 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $10,250 | $468 | Implemented |
WV0322 # 02 Y:2005 | 02 | 2005 | INSULATE BARE EQUIPMENT | $22,045 | $4,322 | Implemented |
WV0322 # 01 Y:2005 | 01 | 2005 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $26,224 | $142,700 | Not Implemented |
NC0293 # 02 Y:2004 | 02 | 2004 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $4,884 | $6,553 | n/a |
NC0293 # 03 Y:2004 | 03 | 2004 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $3,750 | $5,400 | n/a |
NC0293 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,131 | $2,418 | n/a |
NC0293 # 05 Y:2004 | 05 | 2004 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $2,869 | $10,000 | n/a |
NC0293 # 06 Y:2004 | 06 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,981 | $730 | n/a |
NC0293 # 07 Y:2004 | 07 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $752 | $1,000 | n/a |
NC0293 # 01 Y:2004 | 01 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $9,068 | $23,100 | n/a |
WV0283 # 02 Y:2004 | 02 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $9,827 | $5,000 | Not Implemented |
WV0283 # 01 Y:2004 | 01 | 2004 | ADJUST BURNERS FOR EFFICIENT OPERATION | $11,512 | $250 | Implemented |
WV0283 # 04 Y:2004 | 04 | 2004 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $4,877 | $100,430 | Not Implemented |
WV0283 # 05 Y:2004 | 05 | 2004 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $4,643 | $1,290 | Implemented |
WV0283 # 06 Y:2004 | 06 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,222 | $6,500 | Not Implemented |
WV0283 # 07 Y:2004 | 07 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,923 | $86 | Implemented |