Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20
matching recommendationsNAICS | 32311 | Printing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CC0013 # 02 Y:2023 | 02 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,363 | $0 | n/a |
CC0013 # 03 Y:2023 | 03 | 2023 | HEAT WATER DURING OFF-PEAK PERIODS AND STORE FOR LATER USE | $4,697 | $8,400 | n/a |
CC0013 # 04 Y:2023 | 04 | 2023 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $21,990 | $40,000 | n/a |
CC0013 # 05 Y:2023 | 05 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $33,597 | $180,600 | n/a |
CC0013 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,074 | $0 | n/a |
CL2006 # 05 Y:2020 | 05 | 2020 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $4,314 | $3,400 | Implemented |
CL2006 # 04 Y:2020 | 04 | 2020 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $5,769 | $12,768 | Not Implemented |
CL2006 # 03 Y:2020 | 03 | 2020 | MODIFY STARTUP/SHUTDOWN TIMES | $7,541 | $1,000 | Not Implemented |
CL2006 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,133 | $4,500 | Implemented |
CL2006 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $41,598 | $51,573 | Implemented |
CL1906 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,464 | $12,357 | Implemented |
CL1906 # 02 Y:2019 | 02 | 2019 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $694 | $0 | Implemented |
CL1906 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,979 | $1,440 | Implemented |
CL1906 # 04 Y:2019 | 04 | 2019 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $816 | $574 | Implemented |
CL1701 # 06 Y:2017 | 06 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,382 | $6,000 | Not Implemented |
CL1701 # 05 Y:2017 | 05 | 2017 | INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER | $5,838 | $13,500 | Implemented |
CL1701 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,647 | $22,515 | Implemented |
CL1701 # 03 Y:2017 | 03 | 2017 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $12,535 | $3,650 | Implemented |
CL1701 # 02 Y:2017 | 02 | 2017 | INSTALL TIMERS AND/OR THERMOSTATS | $18,050 | $250 | Not Implemented |
CL1701 # 01 Y:2017 | 01 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $36,942 | $10,000 | Implemented |