IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

174

matching recommendations
Reset
NAICS 32311 Printing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0141 # 04 Y:2006 04 2006 AIR CONDITION ONLY SPACE NECESSARY $2,681 $160 Not Implemented
MI0141 # 05 Y:2006 05 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,825 $2,460 Not Implemented
MI0141 # 01 Y:2006 01 2006 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $20,786 $36,000 Not Implemented
MI0141 # 02 Y:2006 02 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,232 $200 Not Implemented
MI0141 # 03 Y:2006 03 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $6,036 $0 Not Implemented
MS0306 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,093 $180 Implemented
MS0306 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,113 $36,171 Not Implemented
MS0306 # 03 Y:2006 03 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,662 $2,550 Implemented
MS0306 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,063 $89,988 Not Implemented
MS0306 # 05 Y:2006 05 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $948 $4,566 Not Implemented
IA0400 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,029 $32,168 Not Implemented
IA0400 # 02 Y:2006 02 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,097 $900 Not Implemented
IA0400 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,532 $1,864 Not Implemented
IA0400 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,976 $16,842 Not Implemented
IA0400 # 06 Y:2006 06 2006 RECOVER WASTE HEAT FROM EQUIPMENT $1,212 $553 Not Implemented
IA0400 # 08 Y:2006 08 2006 REDUCE FLUID FLOW RATES $16,836 $1,580 Not Implemented
IA0400 # 07 Y:2006 07 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,373 $2,000 Not Implemented
IA0400 # 05 Y:2006 05 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $936 $0 Not Implemented
AM0518 # 02 Y:2006 02 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $15,840 $2,500 Not Implemented
AM0518 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN WATER LINES AND VALVES $4,000 $415 Implemented
AM0518 # 04 Y:2006 04 2006 REUSE RAGS UNTIL COMPLETELY SOILED $3,850 $0 Implemented
AM0518 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,280 $500 Implemented
AM0518 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $280 $0 Implemented
AM0518 # 01 Y:2006 01 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $44,220 $1,000 Implemented
WV0352 # 01 Y:2006 01 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,713 $170 Implemented