IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,649

matching recommendations
Reset
NAICS 323111 Commercial Printing (except Screen and Books)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0316 # 11 Y:2025 11 2025 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,060 $0 n/a
IC0316 # 01 Y:2025 01 2025 USE SOLAR HEAT TO MAKE ELECTRICTY $89,150 $489,314 n/a
IC0316 # 05 Y:2025 05 2025 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,039 $346 n/a
IC0316 # 07 Y:2025 07 2025 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $21,124 $3,628 n/a
IC0316 # 10 Y:2025 10 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $525 $205 n/a
IC0316 # 04 Y:2025 04 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,450 $3,794 n/a
IC0316 # 02 Y:2025 02 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,822 $728 n/a
IC0316 # 09 Y:2025 09 2025 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,406 $3,393 n/a
IC0316 # 12 Y:2025 12 2025 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,025 $1,615 n/a
IC0316 # 06 Y:2025 06 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $198 $144 n/a
IC0316 # 13 Y:2025 13 2025 REPLACE BOILER $36,754 $57,900 n/a
IC0316 # 08 Y:2025 08 2025 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $2,349 $3,386 n/a
IC0316 # 03 Y:2025 03 2025 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $93 $379 n/a
TT0307 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,566 $1,450 n/a
TT0307 # 06 Y:2024 06 2024 USE SOLAR HEAT FOR HEAT $27,962 $102,465 n/a
TT0307 # 02 Y:2024 02 2024 REDUCE VENTILATION AIR $5,884 $240 n/a
TT0307 # 04 Y:2024 04 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,477 $3,890 n/a
TT0307 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $176,493 $288,000 n/a
TT0307 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,676 $225 n/a
MI0426 # 04 Y:2023 04 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $7,404 $630 Implemented
MI0426 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $31,593 $0 Implemented
MI0426 # 07 Y:2023 07 2023 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS $3,449 $1,600 Implemented
MI0426 # 11 Y:2023 11 2023 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,774 $205 Not Implemented
MI0426 # 12 Y:2023 12 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,713 $6,180 Not Implemented
MI0426 # 02 Y:2023 02 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $12,768 $62,963 Not Implemented