IAC logo
IAC Assessment: UF0626
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0626
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2024
Principal Product Printed Labels
NAICS 323111 - Commercial Printing (except Screen and Books)
SIC 2759 - Commercial Printing, Nec
Sales $100,000,000-$500,000,000
# of Employees 349
Plant Area (Sq.Ft.) 177,500
Annual Production 1,400,000,000 Units
Production Hrs. Annual 8,008
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $378,577 6,872,296 kWh $0.06
Electricity Demand $211,772 14,178 kW-months/year $14.94
Electricity Fees $99,380 - $ -
TOTAL ENERGY COSTS $689,729
RECOMMENDED SAVINGS* $271,022 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$49,710
Cost:
$322,608
$35,370 643,092 $14,340 960 - - $35,370
643,092
kWh
$14,340
960
kW-months/year
-
-
$
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$41,281
Cost:
$36,971
$26,458 481,061 $14,823 992 - - $26,458
481,061
kWh
$14,823
992
kW-months/year
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$5,328
Cost:
$1,140
$5,328 96,871 - - - - $5,328
96,871
kWh
-
-
kW-months/year
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,036
Cost:
$15,920
$7,036 127,923 - - - - $7,036
127,923
kWh
-
-
kW-months/year
-
-
$
05: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$3,655
Cost:
$12,290
$4,284 77,889 $(-629) (-42) - - $4,284
77,889
kWh
$(-629)
(-42)
kW-months/year
-
-
$
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,871
Cost:
-
$2,871 52,200 - - - - $2,871
52,200
kWh
-
-
kW-months/year
-
-
$
07: 2.5194 REDESIGN PROCESS Savings:
$1,168
Cost:
$4,600
$1,168 21,236 - - - - $1,168
21,236
kWh
-
-
kW-months/year
-
-
$
08: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$1,107
Cost:
$280
$1,107 20,123 - - - - $1,107
20,123
kWh
-
-
kW-months/year
-
-
$
09: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$75,600
Cost:
$740
- - - - $75,600 - -
-
kWh
-
-
kW-months/year
$75,600
-
$
10: 4.424 IMPROVE SPACE COMFORT CONDITIONING Savings:
$57,669
Cost:
$2,320
$(-502) (-9,126) $(-629) (-42) $58,800 - $(-502)
(-9,126)
kWh
$(-629)
(-42)
kW-months/year
$58,800
-
$
11: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$25,597
Cost:
$60,000
$10,985 199,724 $14,612 978 - - $10,985
199,724
kWh
$14,612
978
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$271,022
Cost:
$456,869
$94,105 1,710,993 $42,517 2,846 $134,400 - $94,105
1,710,993
kWh
$42,517
2,846
kW-months/year
$134,400
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes