Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,649
matching recommendationsNAICS | 323111 | Commercial Printing (except Screen and Books) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0316 # 11 Y:2025 | 11 | 2025 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,060 | $0 | n/a |
IC0316 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $89,150 | $489,314 | n/a |
IC0316 # 05 Y:2025 | 05 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,039 | $346 | n/a |
IC0316 # 07 Y:2025 | 07 | 2025 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $21,124 | $3,628 | n/a |
IC0316 # 10 Y:2025 | 10 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $525 | $205 | n/a |
IC0316 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,450 | $3,794 | n/a |
IC0316 # 02 Y:2025 | 02 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,822 | $728 | n/a |
IC0316 # 09 Y:2025 | 09 | 2025 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,406 | $3,393 | n/a |
IC0316 # 12 Y:2025 | 12 | 2025 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $1,025 | $1,615 | n/a |
IC0316 # 06 Y:2025 | 06 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $198 | $144 | n/a |
IC0316 # 13 Y:2025 | 13 | 2025 | REPLACE BOILER | $36,754 | $57,900 | n/a |
IC0316 # 08 Y:2025 | 08 | 2025 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $2,349 | $3,386 | n/a |
IC0316 # 03 Y:2025 | 03 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $93 | $379 | n/a |
TT0307 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,566 | $1,450 | n/a |
TT0307 # 06 Y:2024 | 06 | 2024 | USE SOLAR HEAT FOR HEAT | $27,962 | $102,465 | n/a |
TT0307 # 02 Y:2024 | 02 | 2024 | REDUCE VENTILATION AIR | $5,884 | $240 | n/a |
TT0307 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,477 | $3,890 | n/a |
TT0307 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $176,493 | $288,000 | n/a |
TT0307 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,676 | $225 | n/a |
MI0426 # 04 Y:2023 | 04 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $7,404 | $630 | Implemented |
MI0426 # 01 Y:2023 | 01 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $31,593 | $0 | Implemented |
MI0426 # 07 Y:2023 | 07 | 2023 | MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS | $3,449 | $1,600 | Implemented |
MI0426 # 11 Y:2023 | 11 | 2023 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $1,774 | $205 | Not Implemented |
MI0426 # 12 Y:2023 | 12 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,713 | $6,180 | Not Implemented |
MI0426 # 02 Y:2023 | 02 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $12,768 | $62,963 | Not Implemented |