IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

47

matching recommendations
Reset
NAICS 323111 Commercial Printing (except Screen and Books)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0467 # 14 Y:2013 14 2013 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $326 $810 Not Implemented
WV0467 # 01 Y:2013 01 2013 UPGRADE CONTROLS ON COMPRESSORS $26,386 $31,000 Not Implemented
WV0467 # 02 Y:2013 02 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,885 $0 Not Implemented
WV0467 # 03 Y:2013 03 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,786 $2,550 Implemented
WV0467 # 04 Y:2013 04 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,526 $21,000 Not Implemented
WV0467 # 05 Y:2013 05 2013 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $9,901 $1,000 Implemented
WV0467 # 06 Y:2013 06 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,844 $500 Implemented
WV0467 # 07 Y:2013 07 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,668 $16,750 Not Implemented
WV0467 # 08 Y:2013 08 2013 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $5,230 $3,625 Not Implemented
WV0467 # 09 Y:2013 09 2013 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $2,986 $9,400 Not Implemented
WV0467 # 10 Y:2013 10 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,815 $248 Implemented
WV0467 # 11 Y:2013 11 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,059 $571 Implemented
WV0467 # 12 Y:2013 12 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,260 $45 Implemented
WV0467 # 13 Y:2013 13 2013 DEVELOP A REPAIR/REPLACE POLICY $534 $826 Not Implemented
WV0322 # 03 Y:2005 03 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $10,250 $468 Implemented
WV0322 # 12 Y:2005 12 2005 DEVELOP A REPAIR/REPLACE POLICY $664 $248 Implemented
WV0322 # 11 Y:2005 11 2005 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $687 $250 Implemented
WV0322 # 10 Y:2005 10 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,114 $330 Not Implemented
WV0322 # 09 Y:2005 09 2005 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,045 $160 Not Implemented
WV0322 # 08 Y:2005 08 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,978 $525 Implemented
WV0322 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,341 $0 Implemented
WV0322 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,038 $15,738 Implemented
WV0322 # 05 Y:2005 05 2005 USE RADIANT HEATER FOR SPOT HEATING $6,482 $1,500 Not Implemented
WV0322 # 04 Y:2005 04 2005 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $8,249 $9,180 Not Implemented
WV0322 # 02 Y:2005 02 2005 INSULATE BARE EQUIPMENT $22,045 $4,322 Implemented