Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,649
matching recommendationsNAICS | 323111 | Commercial Printing (except Screen and Books) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0540 # 01 Y:2019 | 01 | 2019 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $3,623 | $0 | Implemented |
SF0540 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,827 | $0 | Implemented |
SF0540 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,339 | $325 | Implemented |
SF0540 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,918 | $19,682 | Implemented |
SF0540 # 05 Y:2019 | 05 | 2019 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $242 | $688 | Implemented |
SF0540 # 06 Y:2019 | 06 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,740 | $21,083 | Implemented |
SF0540 # 07 Y:2019 | 07 | 2019 | USE SOLAR HEAT TO MAKE ELECTRICTY | $99,319 | $402,121 | Not Implemented |
UK1903 # 01 Y:2019 | 01 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $515 | $0 | n/a |
UK1903 # 02 Y:2019 | 02 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,579 | $0 | n/a |
UK1903 # 03 Y:2019 | 03 | 2019 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,341 | $0 | n/a |
UK1903 # 04 Y:2019 | 04 | 2019 | INSTALL OCCUPANCY SENSORS | $2,357 | $717 | n/a |
UK1903 # 05 Y:2019 | 05 | 2019 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $311 | $1,218 | n/a |
UK1903 # 06 Y:2019 | 06 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $451 | $486 | n/a |
UK1903 # 07 Y:2019 | 07 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,016 | $11,658 | n/a |
UK1903 # 08 Y:2019 | 08 | 2019 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $332 | $0 | n/a |
UK1903 # 09 Y:2019 | 09 | 2019 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $8,326 | $6,103 | n/a |
CL1906 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,464 | $12,357 | Implemented |
CL1906 # 02 Y:2019 | 02 | 2019 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $694 | $0 | Implemented |
CL1906 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,979 | $1,440 | Implemented |
CL1906 # 04 Y:2019 | 04 | 2019 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $816 | $574 | Implemented |
UK1902 # 01 Y:2019 | 01 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $257 | $0 | n/a |
UK1902 # 02 Y:2019 | 02 | 2019 | DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING | $428 | $0 | n/a |
UK1902 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $641 | $1,210 | n/a |
UK1902 # 04 Y:2019 | 04 | 2019 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $892 | $0 | n/a |
UK1902 # 05 Y:2019 | 05 | 2019 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,010 | $0 | n/a |