IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,649

matching recommendations
Reset
NAICS 323111 Commercial Printing (except Screen and Books)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0387 # 01 Y:2006 01 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,756 $680 Not Implemented
IA0387 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,927 $15,519 Implemented
IA0387 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $349 $0 Not Implemented
IA0387 # 04 Y:2006 04 2006 INSTALL OCCUPANCY SENSORS $542 $1,540 Not Implemented
IA0387 # 05 Y:2006 05 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,935 $50 Implemented
IA0387 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,664 $500 Implemented
IA0387 # 07 Y:2006 07 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $338 $725 Not Implemented
IA0387 # 08 Y:2006 08 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $405 $1,550 Not Implemented
TA0115 # 01 Y:2006 01 2006 REPAIR AND ELIMINATE STEAM LEAKS $6,840 $190 Not Implemented
TA0115 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,445 $210 Not Implemented
TA0115 # 03 Y:2006 03 2006 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,295 $0 Not Implemented
TA0115 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $900 $1,500 Not Implemented
TA0115 # 05 Y:2006 05 2006 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $2,645 $4,760 Not Implemented
AS0418 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,182 $15,913 n/a
AS0418 # 02 Y:2006 02 2006 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $15,053 $0 n/a
AS0418 # 03 Y:2006 03 2006 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $12,196 $0 n/a
AS0418 # 04 Y:2006 04 2006 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $6,612 $550 n/a
AS0418 # 05 Y:2006 05 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,272 $1,000 n/a
AS0418 # 06 Y:2006 06 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,394 $1,900 n/a
AS0418 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,386 $3,000 n/a
AS0418 # 08 Y:2006 08 2006 USE SOLAR HEAT TO HEAT WATER $358 $2,800 n/a
MA0600 # 01 Y:2006 01 2006 USE UTILITY CONTROLLED POWER MANAGEMENT $24,000 $0 Not Implemented
MA0600 # 02 Y:2006 02 2006 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $8,271 $12,700 Not Implemented
MA0600 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,209 $17,438 Not Implemented
MA0600 # 04 Y:2006 04 2006 OPTIMIZE PLANT POWER FACTOR $5,321 $10,000 Not Implemented