Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,649
matching recommendationsNAICS | 323111 | Commercial Printing (except Screen and Books) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0356 # 08 Y:2003 | 08 | 2003 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $39,566 | $55,100 | n/a |
AS0356 # 09 Y:2003 | 09 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,865 | $10,800 | n/a |
AS0356 # 10 Y:2003 | 10 | 2003 | AIR CONDITION ONLY SPACE NECESSARY | $957 | $4,260 | Not Implemented |
AS0356 # 11 Y:2003 | 11 | 2003 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $4,280 | $17,100 | Implemented |
AS0356 # 12 Y:2003 | 12 | 2003 | CLEAR AND RENT EXISTING SPACE | $96,000 | $8,340 | Implemented |
WI0446 # 01 Y:2003 | 01 | 2003 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $20,491 | $40,000 | Implemented |
WI0446 # 02 Y:2003 | 02 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,813 | $15,675 | n/a |
WI0446 # 03 Y:2003 | 03 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,528 | $500 | Implemented |
WI0446 # 04 Y:2003 | 04 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,093 | $1,359 | Implemented |
WI0446 # 05 Y:2003 | 05 | 2003 | UPGRADE CONTROLS ON COMPRESSORS | $1,214 | $3,500 | Not Implemented |
WI0446 # 06 Y:2003 | 06 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $945 | $740 | Implemented |
GT0758 # 01 Y:2003 | 01 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,720 | $47,268 | Implemented |
GT0758 # 02 Y:2003 | 02 | 2003 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $9,072 | $12,000 | Implemented |
GT0758 # 03 Y:2003 | 03 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,895 | $47,736 | n/a |
GT0758 # 04 Y:2003 | 04 | 2003 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $14,438 | $31,350 | n/a |
GT0758 # 05 Y:2003 | 05 | 2003 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $322 | $0 | Implemented |
GT0758 # 06 Y:2003 | 06 | 2003 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $28,386 | $12,140 | n/a |
GT0758 # 07 Y:2003 | 07 | 2003 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,773 | $6,150 | Not Implemented |
GT0758 # 08 Y:2003 | 08 | 2003 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $23,420 | $1,850 | Implemented |
CO0520 # 01 Y:2003 | 01 | 2003 | USE POWER DURING OFF-PEAK PERIODS | $12,470 | $10,000 | Not Implemented |
CO0520 # 02 Y:2003 | 02 | 2003 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $10,530 | $39,900 | Not Implemented |
CO0520 # 03 Y:2003 | 03 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $304 | $508 | Not Implemented |
CO0520 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,460 | $260 | Implemented |
CO0520 # 05 Y:2003 | 05 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $410 | $260 | Not Implemented |