Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 2004
Principal Product printed advertisements
NAICS 323111 - Commercial Printing (except Screen and Books)
SIC 2752 - Commercial Printing, Lithographic
Sales $50,000,000-$100,000,000
# of Employees 170
Plant Area (Sq.Ft.) 152,600
Annual Production 157,000,000 Pounds
Production Hrs. Annual 8,736
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $549,613 20,626,124 kWh $0.03
Electricity Demand $405,359 37,356 kW-months/year $10.85
Natural Gas $470,938 108,296 MMBtu $4.35
TOTAL ENERGY COSTS $1,426,168
RECOMMENDED SAVINGS* $288,816 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,810
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,614
Cost:
$583
$5,194 205,126 $2,420 282 - - $5,194
205,126
kWh
$2,420
282
kW-months/year
-
-
MMBtu
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,911
Cost:
$20
$1,304 51,542 $607 71 - - $1,304
51,542
kWh
$607
71
kW-months/year
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,175
Cost:
$6,855
$3,165 125,061 $2,010 234 - - $3,165
125,061
kWh
$2,010
234
kW-months/year
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,096
Cost:
$2,988
$3,471 137,223 $1,625 16 - - $3,471
137,223
kWh
$1,625
16
kW-months/year
-
-
MMBtu
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,196
Cost:
$664
$816 32,249 $380 4 - - $816
32,249
kWh
$380
4
kW-months/year
-
-
MMBtu
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$267,824
Cost:
$500,000
$(-14,839) (-586,535) $(-6,912) (-806) $289,575 66,569 $(-14,839)
(-586,535)
kWh
$(-6,912)
(-806)
kW-months/year
$289,575
66,569
MMBtu
TOTAL RECOMMENDED Savings:
$288,816
Cost:
$511,110
$(-889) (-35,334) $130 (-199) $289,575 66,569 $(-889)
(-35,334)
kWh
$130
(-199)
kW-months/year
$289,575
66,569
MMBtu
TOTAL IMPLEMENTED Savings:
$8,810
Cost:
$1,247
$6,010 237,375 $2,800 286 - - $6,010
237,375
kWh
$2,800
286
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas