Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
74
matching recommendationsNAICS | 323111 | Commercial Printing (except Screen and Books) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UL2206 # 07 Y:2022 | 07 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $73,600 | $600,732 | Not Implemented |
UL2206 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,464 | $1,280 | Not Implemented |
UL2206 # 05 Y:2022 | 05 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $577 | $0 | Not Implemented |
UL2206 # 04 Y:2022 | 04 | 2022 | INSTALL OCCUPANCY SENSORS | $2,477 | $4,965 | Not Implemented |
UL2206 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,212 | $2,677 | Not Implemented |
UL2206 # 02 Y:2022 | 02 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,086 | $1,631 | Not Implemented |
UL2206 # 01 Y:2022 | 01 | 2022 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $25,756 | $6,000 | Not Implemented |
UK1910 # 06 Y:2019 | 06 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $569 | $300 | Implemented |
UK1910 # 11 Y:2019 | 11 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,251 | $1,000 | Implemented |
UK1910 # 10 Y:2019 | 10 | 2019 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $1,344 | $2,838 | Implemented |
UK1910 # 09 Y:2019 | 09 | 2019 | REDUCE FLUID FLOW RATES | $1,484 | $1,900 | Implemented |
UK1910 # 12 Y:2019 | 12 | 2019 | OPTIMIZE PLANT POWER FACTOR | $13,040 | $16,170 | Implemented |
UK1910 # 08 Y:2019 | 08 | 2019 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,365 | $3,625 | Implemented |
UK1910 # 13 Y:2019 | 13 | 2019 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $7,015 | $0 | Implemented |
UK1910 # 07 Y:2019 | 07 | 2019 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $838 | $350 | Implemented |
UK1910 # 03 Y:2019 | 03 | 2019 | INSULATE BARE EQUIPMENT | $280 | $161 | Implemented |
UK1910 # 05 Y:2019 | 05 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $65,342 | $110,141 | Implemented |
UK1910 # 04 Y:2019 | 04 | 2019 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $4,283 | $0 | Implemented |
UK1910 # 02 Y:2019 | 02 | 2019 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $510 | $1,775 | Implemented |
UK1910 # 01 Y:2019 | 01 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,415 | $2,477 | Implemented |
UK1902 # 02 Y:2019 | 02 | 2019 | DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING | $428 | $0 | n/a |
UK1902 # 05 Y:2019 | 05 | 2019 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,010 | $0 | n/a |
UK1902 # 04 Y:2019 | 04 | 2019 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $892 | $0 | n/a |
UK1902 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $641 | $1,210 | n/a |
UK1902 # 07 Y:2019 | 07 | 2019 | INSTALL OCCUPANCY SENSORS | $1,959 | $1,680 | n/a |