Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
47
matching recommendationsNAICS | 323111 | Commercial Printing (except Screen and Books) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0467 # 12 Y:2013 | 12 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,260 | $45 | Implemented |
WV0467 # 01 Y:2013 | 01 | 2013 | UPGRADE CONTROLS ON COMPRESSORS | $26,386 | $31,000 | Not Implemented |
WV0467 # 04 Y:2013 | 04 | 2013 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $12,526 | $21,000 | Not Implemented |
WV0467 # 06 Y:2013 | 06 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,844 | $500 | Implemented |
WV0467 # 07 Y:2013 | 07 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,668 | $16,750 | Not Implemented |
WV0467 # 05 Y:2013 | 05 | 2013 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $9,901 | $1,000 | Implemented |
WV0467 # 02 Y:2013 | 02 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $24,885 | $0 | Not Implemented |
WV0467 # 09 Y:2013 | 09 | 2013 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $2,986 | $9,400 | Not Implemented |
WV0467 # 03 Y:2013 | 03 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $14,786 | $2,550 | Implemented |
WV0467 # 13 Y:2013 | 13 | 2013 | DEVELOP A REPAIR/REPLACE POLICY | $534 | $826 | Not Implemented |
WV0467 # 14 Y:2013 | 14 | 2013 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $326 | $810 | Not Implemented |
WV0467 # 10 Y:2013 | 10 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,815 | $248 | Implemented |
WV0467 # 11 Y:2013 | 11 | 2013 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,059 | $571 | Implemented |
WV0467 # 08 Y:2013 | 08 | 2013 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $5,230 | $3,625 | Not Implemented |
WV0322 # 05 Y:2005 | 05 | 2005 | USE RADIANT HEATER FOR SPOT HEATING | $6,482 | $1,500 | Not Implemented |
WV0322 # 04 Y:2005 | 04 | 2005 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $8,249 | $9,180 | Not Implemented |
WV0322 # 03 Y:2005 | 03 | 2005 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $10,250 | $468 | Implemented |
WV0322 # 02 Y:2005 | 02 | 2005 | INSULATE BARE EQUIPMENT | $22,045 | $4,322 | Implemented |
WV0322 # 01 Y:2005 | 01 | 2005 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $26,224 | $142,700 | Not Implemented |
WV0322 # 06 Y:2005 | 06 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,038 | $15,738 | Implemented |
WV0322 # 07 Y:2005 | 07 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,341 | $0 | Implemented |
WV0322 # 12 Y:2005 | 12 | 2005 | DEVELOP A REPAIR/REPLACE POLICY | $664 | $248 | Implemented |
WV0322 # 08 Y:2005 | 08 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,978 | $525 | Implemented |
WV0322 # 10 Y:2005 | 10 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,114 | $330 | Not Implemented |
WV0322 # 11 Y:2005 | 11 | 2005 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $687 | $250 | Implemented |