IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

55

matching recommendations
Reset
NAICS 323111 Commercial Printing (except Screen and Books)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0006 # 01 Y:2007 01 2007 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $3,642 $0 Implemented
DL0006 # 02 Y:2007 02 2007 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $2,178 $0 Not Implemented
DL0006 # 03 Y:2007 03 2007 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $6,925 $995 Not Implemented
OK0750 # 09 Y:2007 09 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,287 $6,522 Not Implemented
OK0750 # 01 Y:2007 01 2007 INSTALL TIMERS AND/OR THERMOSTATS $6,319 $1,100 Not Implemented
OK0750 # 02 Y:2007 02 2007 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,776 $8,988 Not Implemented
OK0750 # 03 Y:2007 03 2007 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $1,091 $4,248 Not Implemented
OK0750 # 05 Y:2007 05 2007 INSTALL SKYLIGHTS $5,428 $33,634 Not Implemented
OK0750 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,311 $7,391 Not Implemented
OK0750 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,081 $5,998 Not Implemented
OK0750 # 08 Y:2007 08 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,525 $1,000 Not Implemented
OK0750 # 10 Y:2007 10 2007 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $4,150,588 $195,000 Not Implemented
OK0750 # 04 Y:2007 04 2007 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $8,272 $16,000 Not Implemented
BD0329 # 04 Y:2007 04 2007 INSTALL OCCUPANCY SENSORS $3,724 $225 Not Implemented
BD0329 # 01 Y:2007 01 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $641 $300 Implemented
BD0329 # 09 Y:2007 09 2007 MINIMIZE WATER USAGE $977 $2,000 Not Implemented
BD0329 # 08 Y:2007 08 2007 CHANGE OPERATING CONDITIONS $3,140 $0 Not Implemented
BD0329 # 07 Y:2007 07 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,306 $2,200 Implemented
BD0329 # 06 Y:2007 06 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,834 $3,600 Implemented
BD0329 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $237 $225 Implemented
BD0329 # 03 Y:2007 03 2007 USE SYNTHETIC LUBRICANT $1,202 $300 Implemented
BD0329 # 02 Y:2007 02 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,042 $0 Not Implemented
DL0002 # 03 Y:2007 03 2007 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $19,418 $73,950 Not Implemented
DL0002 # 04 Y:2007 04 2007 USE SOLAR HEAT TO HEAT MAKE-UP AIR $20,592 $100,100 Not Implemented
DL0002 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $49,771 $62,783 Not Implemented