Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
60
matching recommendationsNAICS | 323111 | Commercial Printing (except Screen and Books) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0828 # 02 Y:2010 | 02 | 2010 | DISCONNECT BALLASTS | $4,524 | $550 | Not Implemented |
UD0828 # 17 Y:2010 | 17 | 2010 | INSTALL FOSSIL FUEL MAKE-UP AIR UNIT | $15,589 | $35,000 | Not Implemented |
UD0828 # 16 Y:2010 | 16 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $52,035 | $62,500 | Not Implemented |
UD0828 # 15 Y:2010 | 15 | 2010 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $990 | $250 | Not Implemented |
UD0828 # 14 Y:2010 | 14 | 2010 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $11,308 | $25 | Not Implemented |
UD0828 # 13 Y:2010 | 13 | 2010 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $16,653 | $25 | Implemented |
UD0828 # 12 Y:2010 | 12 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,066 | $5,000 | Not Implemented |
UD0828 # 11 Y:2010 | 11 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,598 | $500 | Not Implemented |
UD0828 # 10 Y:2010 | 10 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,710 | $500 | Implemented |
UD0828 # 09 Y:2010 | 09 | 2010 | UPGRADE CONTROLS ON COMPRESSORS | $6,407 | $2,100 | Not Implemented |
UD0828 # 08 Y:2010 | 08 | 2010 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,272 | $14,000 | Not Implemented |
UD0828 # 07 Y:2010 | 07 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,431 | $1,200 | Implemented |
UD0828 # 06 Y:2010 | 06 | 2010 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $17,796 | $62,106 | Implemented |
UD0828 # 05 Y:2010 | 05 | 2010 | TURN OFF EQUIPMENT WHEN NOT IN USE | $28,346 | $12,800 | Not Implemented |
UD0828 # 04 Y:2010 | 04 | 2010 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $86,333 | $28,000 | Not Implemented |
UD0828 # 03 Y:2010 | 03 | 2010 | INSTALL OCCUPANCY SENSORS | $2,693 | $2,405 | Not Implemented |
UD0828 # 01 Y:2010 | 01 | 2010 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $2,599 | $2,599 | Not Implemented |
UD0828 # 18 Y:2010 | 18 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,601 | $25 | Not Implemented |
IC0179 # 02 Y:2010 | 02 | 2010 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,268 | $0 | Not Implemented |
IC0179 # 03 Y:2010 | 03 | 2010 | INSTALL OCCUPANCY SENSORS | $389 | $2,833 | Implemented |
IC0179 # 04 Y:2010 | 04 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,327 | $626 | Implemented |
IC0179 # 05 Y:2010 | 05 | 2010 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $11,072 | $34,800 | Not Implemented |
IC0179 # 06 Y:2010 | 06 | 2010 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $19,064 | $3,510 | Not Implemented |
IC0179 # 07 Y:2010 | 07 | 2010 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $357 | $0 | Not Implemented |
IC0179 # 01 Y:2010 | 01 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $203 | $82 | Implemented |