Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,792
matching recommendationsNAICS | 325 | Chemical Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0597 # 07 Y:2025 | 07 | 2025 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $1,873 | $5,000 | n/a |
LE0597 # 11 Y:2025 | 11 | 2025 | INSTALL OCCUPANCY SENSORS | $88 | $400 | n/a |
LE0597 # 08 Y:2025 | 08 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $435 | $1,500 | n/a |
LE0597 # 03 Y:2025 | 03 | 2025 | INSTALL OCCUPANCY SENSORS | $3,215 | $490 | n/a |
LE0597 # 10 Y:2025 | 10 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,669 | $6,564 | n/a |
LE0597 # 04 Y:2025 | 04 | 2025 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $11,346 | $5,000 | n/a |
LE0597 # 06 Y:2025 | 06 | 2025 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $408 | $1,000 | n/a |
LE0597 # 09 Y:2025 | 09 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $8,717 | $32,299 | n/a |
LE0597 # 05 Y:2025 | 05 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,192 | $1,500 | n/a |
LE0597 # 02 Y:2025 | 02 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $16,130 | $280 | n/a |
LE0597 # 01 Y:2025 | 01 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,997 | $0 | n/a |
MZ0372 # 02 Y:2025 | 02 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $363 | $936 | n/a |
UF0628 # 06 Y:2025 | 06 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,938 | $0 | n/a |
MZ0372 # 04 Y:2025 | 04 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,903 | $0 | n/a |
UF0628 # 04 Y:2025 | 04 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,671 | $41,856 | n/a |
MZ0372 # 06 Y:2025 | 06 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,800 | $19,900 | n/a |
MZ0372 # 05 Y:2025 | 05 | 2025 | USE DECANTING, FLOTATION TO REMOVE CONTAMINANTS | $342,886 | $535,000 | n/a |
MZ0372 # 03 Y:2025 | 03 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $19,842 | $4,740 | n/a |
UF0628 # 03 Y:2025 | 03 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $12,464 | $25,640 | n/a |
UF0628 # 05 Y:2025 | 05 | 2025 | UPGRADE OBSOLETE EQUIPMENT | $4,580 | $16,608 | n/a |
MZ0372 # 01 Y:2025 | 01 | 2025 | INSTALL OCCUPANCY SENSORS | $2,478 | $900 | n/a |
UF0628 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $45,801 | $322,608 | n/a |
UF0628 # 07 Y:2025 | 07 | 2025 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $3,937 | $18,930 | n/a |
UF0628 # 02 Y:2025 | 02 | 2025 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $43,459 | $43,906 | n/a |
MZ0372 # 07 Y:2025 | 07 | 2025 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $32,864 | $8,100 | n/a |