Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,567
matching recommendationsNAICS | 325 | Chemical Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0472 # 10 Y:2013 | 10 | 2013 | INSULATE BARE EQUIPMENT | $3,020 | $3,318 | Implemented |
WV0472 # 11 Y:2013 | 11 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,009 | $3,180 | Not Implemented |
WV0472 # 12 Y:2013 | 12 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,824 | $356 | Implemented |
WV0472 # 13 Y:2013 | 13 | 2013 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $2,094 | $38 | Implemented |
WV0472 # 14 Y:2013 | 14 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,023 | $76 | Implemented |
WV0472 # 15 Y:2013 | 15 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,536 | $5,377 | Not Implemented |
WV0472 # 16 Y:2013 | 16 | 2013 | REDUCE EXCESS STEAM BLEEDING | $452 | $2,152 | Implemented |
WV0472 # 17 Y:2013 | 17 | 2013 | DEVELOP A REPAIR/REPLACE POLICY | $337 | $700 | Implemented |
BS0015 # 01 Y:2013 | 01 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $96 | $241 | Not Implemented |
BS0015 # 02 Y:2013 | 02 | 2013 | INSTALL OCCUPANCY SENSORS | $105 | $140 | Not Implemented |
BS0015 # 03 Y:2013 | 03 | 2013 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $165 | $50 | Not Implemented |
BS0015 # 04 Y:2013 | 04 | 2013 | INSTALL / REPAIR INSULATION ON STEAM LINES | $211 | $979 | Implemented |
BS0015 # 05 Y:2013 | 05 | 2013 | IMPROVE COMBUSTION CONTROL CAPABILITY | $607 | $990 | Implemented |
BS0015 # 06 Y:2013 | 06 | 2013 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $127 | $747 | Not Implemented |
BS0015 # 07 Y:2013 | 07 | 2013 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $93 | $1,073 | Not Implemented |
BS0015 # 08 Y:2013 | 08 | 2013 | MINIMIZE WATER USAGE | $151 | $59 | Implemented |
MZ0119 # 01 Y:2013 | 01 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,963 | $0 | Implemented |
MZ0119 # 02 Y:2013 | 02 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,154 | $14,260 | Implemented |
MZ0119 # 03 Y:2013 | 03 | 2013 | INSTALL OCCUPANCY SENSORS | $1,150 | $900 | Implemented |
MZ0119 # 04 Y:2013 | 04 | 2013 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,728 | $0 | Not Implemented |
UD0881 # 01 Y:2013 | 01 | 2013 | COMBINE UTILITY METERS | $18,015 | $72,060 | Not Implemented |
UD0881 # 02 Y:2013 | 02 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,622 | $24,525 | Implemented |
UD0881 # 03 Y:2013 | 03 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,257 | $0 | Implemented |
UD0881 # 04 Y:2013 | 04 | 2013 | DEVELOP A REPAIR/REPLACE POLICY | $1,024 | $1,525 | Implemented |
UD0881 # 05 Y:2013 | 05 | 2013 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $2,823 | $1,200 | Implemented |