IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,567

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0472 # 10 Y:2013 10 2013 INSULATE BARE EQUIPMENT $3,020 $3,318 Implemented
WV0472 # 11 Y:2013 11 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,009 $3,180 Not Implemented
WV0472 # 12 Y:2013 12 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,824 $356 Implemented
WV0472 # 13 Y:2013 13 2013 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $2,094 $38 Implemented
WV0472 # 14 Y:2013 14 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,023 $76 Implemented
WV0472 # 15 Y:2013 15 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,536 $5,377 Not Implemented
WV0472 # 16 Y:2013 16 2013 REDUCE EXCESS STEAM BLEEDING $452 $2,152 Implemented
WV0472 # 17 Y:2013 17 2013 DEVELOP A REPAIR/REPLACE POLICY $337 $700 Implemented
BS0015 # 01 Y:2013 01 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $96 $241 Not Implemented
BS0015 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $105 $140 Not Implemented
BS0015 # 03 Y:2013 03 2013 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $165 $50 Not Implemented
BS0015 # 04 Y:2013 04 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $211 $979 Implemented
BS0015 # 05 Y:2013 05 2013 IMPROVE COMBUSTION CONTROL CAPABILITY $607 $990 Implemented
BS0015 # 06 Y:2013 06 2013 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $127 $747 Not Implemented
BS0015 # 07 Y:2013 07 2013 UTILIZE A LESS EXPENSIVE COOLING METHOD $93 $1,073 Not Implemented
BS0015 # 08 Y:2013 08 2013 MINIMIZE WATER USAGE $151 $59 Implemented
MZ0119 # 01 Y:2013 01 2013 RECOVER WASTE HEAT FROM EQUIPMENT $2,963 $0 Implemented
MZ0119 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,154 $14,260 Implemented
MZ0119 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $1,150 $900 Implemented
MZ0119 # 04 Y:2013 04 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,728 $0 Not Implemented
UD0881 # 01 Y:2013 01 2013 COMBINE UTILITY METERS $18,015 $72,060 Not Implemented
UD0881 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,622 $24,525 Implemented
UD0881 # 03 Y:2013 03 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,257 $0 Implemented
UD0881 # 04 Y:2013 04 2013 DEVELOP A REPAIR/REPLACE POLICY $1,024 $1,525 Implemented
UD0881 # 05 Y:2013 05 2013 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,823 $1,200 Implemented