IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,567

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0338 # 09 Y:2013 09 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,693 $15,784 Not Implemented
SU0338 # 10 Y:2013 10 2013 UPGRADE OBSOLETE EQUIPMENT $64 $224 Implemented
NC0479 # 01 Y:2013 01 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,663 $40,000 Not Implemented
NC0479 # 02 Y:2013 02 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,601 $10,000 Implemented
NC0479 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,261 $100 Implemented
NC0479 # 04 Y:2013 04 2013 RECOVER WASTE HEAT FROM EQUIPMENT $1,378 $3,750 Not Implemented
NC0479 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $99 $351 Implemented
NC0479 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $238 $1,102 Implemented
NC0479 # 07 Y:2013 07 2013 USE PHOTOCELL CONTROLS $106 $250 Implemented
NC0479 # 08 Y:2013 08 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,059 $2,867 Not Implemented
NC0479 # 09 Y:2013 09 2013 INSULATE BARE EQUIPMENT $533 $350 Implemented
UA0096 # 01 Y:2013 01 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $13,079 $0 Implemented
UA0096 # 02 Y:2013 02 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $817 $996 Implemented
UA0096 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,715 $39,573 Implemented
UA0096 # 04 Y:2013 04 2013 INSTALL OCCUPANCY SENSORS $1,997 $545 Implemented
UA0096 # 05 Y:2013 05 2013 INSTALL TIMERS AND/OR THERMOSTATS $3,456 $1,320 Implemented
UA0096 # 06 Y:2013 06 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $766 $8 Not Implemented
UA0096 # 07 Y:2013 07 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $485 $400 Not Implemented
UA0096 # 08 Y:2013 08 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $321 $1,000 Not Implemented
SF0427 # 01 Y:2013 01 2013 INSTALL SPECTRAL REFLECTORS / DELAMP $2,240 $396 Not Implemented
SF0427 # 02 Y:2013 02 2013 INSULATE FEEDWATER TANK $445 $195 Not Implemented
SF0427 # 03 Y:2013 03 2013 REDUCE EXCESS STEAM BLEEDING $1,742 $1,330 Not Implemented
SF0427 # 04 Y:2013 04 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,094 $4,350 Not Implemented
SF0427 # 05 Y:2013 05 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,698 $8,191 Not Implemented
SF0427 # 06 Y:2013 06 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,704 $5,524 Not Implemented