Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,717
matching recommendationsNAICS | 325 | Chemical Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0579 # 04 Y:2024 | 04 | 2024 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $878 | $473 | n/a |
AS0579 # 05 Y:2024 | 05 | 2024 | REDUCE HEAT GAIN BY WINDOW TINTING | $166 | $566 | n/a |
AS0579 # 06 Y:2024 | 06 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $144 | $350 | n/a |
AS0579 # 07 Y:2024 | 07 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $135 | $217 | n/a |
LS2409 # 01 Y:2024 | 01 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $1,382 | $165 | Not Implemented |
LS2409 # 02 Y:2024 | 02 | 2024 | REPAIR OR REPLACE STEAM TRAPS | $5,037 | $2,600 | Implemented |
LS2409 # 03 Y:2024 | 03 | 2024 | INSTALL SUB-METERING EQUIPMENT | $13,250 | $9,000 | Not Implemented |
LS2409 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $162,757 | $116,320 | Not Implemented |
LS2409 # 05 Y:2024 | 05 | 2024 | IMPROVE COMBUSTION CONTROL CAPABILITY | $18,443 | $20,000 | Not Implemented |
LS2409 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,911 | $2,088 | Implemented |
LS2409 # 07 Y:2024 | 07 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $11,502 | $18,750 | Not Implemented |
SD0657 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,534 | $5,677 | Implemented |
SD0657 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,484 | $6,349 | Implemented |
SD0657 # 03 Y:2024 | 03 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $65,886 | $151,862 | Not Implemented |
SD0657 # 04 Y:2024 | 04 | 2024 | USE BATTERY STORAGE FOR DEMAND CONTROL | $18,206 | $0 | Not Implemented |
SD0657 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,234 | $2,880 | Not Implemented |
SD0657 # 06 Y:2024 | 06 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,186 | $10,841 | Implemented |
SD0657 # 07 Y:2024 | 07 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,983 | $13,634 | Implemented |
SD0657 # 08 Y:2024 | 08 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,440 | $3,627 | Not Implemented |
CC0037 # 01 Y:2024 | 01 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $24,323 | $22,680 | n/a |
CC0037 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,523 | $8,400 | n/a |
CC0037 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,159 | $1,880 | n/a |
CC0037 # 04 Y:2024 | 04 | 2024 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,235 | $0 | n/a |
CC0037 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,282 | $1,000 | n/a |
CC0037 # 06 Y:2024 | 06 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,010 | $2,500 | n/a |