IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,556

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0313 # 05 Y:2009 05 2009 INSTALL OCCUPANCY SENSORS $425 $330 Not Implemented
LL0313 # 06 Y:2009 06 2009 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $316 $270 Not Implemented
BD0363 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,251 $33,434 Implemented
BD0363 # 02 Y:2009 02 2009 INSTALL OCCUPANCY SENSORS $2,677 $1,875 Implemented
BD0363 # 03 Y:2009 03 2009 DISCONNECT BALLASTS $591 $100 Not Implemented
BD0363 # 04 Y:2009 04 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,380 $0 Implemented
BD0363 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,364 $200 Implemented
BD0363 # 06 Y:2009 06 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,398 $7,180 Implemented
BD0363 # 07 Y:2009 07 2009 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $17,662 $3,500 Not Implemented
BD0363 # 08 Y:2009 08 2009 USE RADIANT HEATER FOR SPOT HEATING $22,508 $28,000 Not Implemented
BD0363 # 09 Y:2009 09 2009 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $271 $760 Implemented
BD0363 # 10 Y:2009 10 2009 MINIMIZE WATER USAGE $126 $954 Implemented
BD0363 # 11 Y:2009 11 2009 MINIMIZE WATER USAGE $361 $250 Not Implemented
BD0359 # 01 Y:2009 01 2009 INSTALL OCCUPANCY SENSORS $7,879 $1,450 Implemented
BD0359 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,596 $1,225 Implemented
BD0359 # 03 Y:2009 03 2009 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $17,260 $660 Implemented
BD0359 # 04 Y:2009 04 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,366 $800 Implemented
BD0359 # 05 Y:2009 05 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,430 $0 Implemented
BD0359 # 06 Y:2009 06 2009 RECOVER WASTE HEAT FROM EQUIPMENT $26,170 $2,000 Not Implemented
BD0359 # 07 Y:2009 07 2009 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $2,175 $3,000 Not Implemented
BD0359 # 08 Y:2009 08 2009 USE RADIANT HEATER FOR SPOT HEATING $48,695 $18,550 Not Implemented
BD0359 # 09 Y:2009 09 2009 MODIFY STARTUP/SHUTDOWN TIMES $30,076 $0 Not Implemented
BD0359 # 10 Y:2009 10 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,946 $8,340 Implemented
CO0620 # 01 Y:2009 01 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,390 $10,070 Not Implemented
CO0620 # 02 Y:2009 02 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,190 $11,640 Not Implemented