Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2009
Principal Product Oil and water based wppd finishing products
NAICS 325510 - Paint and Coating Manufacturing
SIC 2851 - Paints And Allied Products
Sales $100,000,000-$500,000,000
# of Employees 186
Plant Area (Sq.Ft.) 302,000
Annual Production 12,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $230,257 4,747,500 kWh $0.05
Electricity Demand $104,132 9,917 kW-months/year $10.50
Electricity Fees $882 - $ -
TOTAL ENERGY COSTS $335,271
RECOMMENDED SAVINGS* $156,593 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $49,477
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Primary Raw Material Electricity Usage Electricity Demand Natural Gas Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$7,879
Cost:
$1,450
$4,225 87,121 $3,654 348 - - - - $4,225
87,121
kWh
$3,654
348
kW-months/year
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,596
Cost:
$1,225
$743 15,312 $220 21 - - $633 - $743
15,312
kWh
$220
21
kW-months/year
-
-
MMBtu
$633
-
$
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$17,260
Cost:
$660
$12,521 136,580 $4,739 239 - - - - $12,521
136,580
kWh
$4,739
239
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,366
Cost:
$800
$1,568 32,329 $798 76 - - - - $1,568
32,329
kWh
$798
76
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$12,430
Cost:
-
$8,039 165,750 $4,391 418 - - - - $8,039
165,750
kWh
$4,391
418
kW-months/year
-
-
MMBtu
-
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$26,170
Cost:
$2,000
- - - - $26,170 2,366 - - -
-
kWh
-
-
kW-months/year
$26,170
2,366
MMBtu
-
-
$
07: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$2,175
Cost:
$3,000
- - - - $2,175 197 - - -
-
kWh
-
-
kW-months/year
$2,175
197
MMBtu
-
-
$
08: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$48,695
Cost:
$18,550
- - - - $48,695 4,402 - - -
-
kWh
-
-
kW-months/year
$48,695
4,402
MMBtu
-
-
$
09: 4.454 MODIFY STARTUP/SHUTDOWN TIMES Savings:
$30,076
Cost:
-
$15,334 316,160 $14,742 1,404 - - - - $15,334
316,160
kWh
$14,742
1,404
kW-months/year
-
-
MMBtu
-
-
$
10: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$7,946
Cost:
$8,340
$5,771 118,483 $2,175 207 - - - - $5,771
118,483
kWh
$2,175
207
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$156,593
Cost:
$36,025
$48,201 871,735 $30,719 2,713 $77,040 6,965 $633 - $48,201
871,735
kWh
$30,719
2,713
kW-months/year
$77,040
6,965
MMBtu
$633
-
$
TOTAL IMPLEMENTED Savings:
$49,477
Cost:
$12,475
$32,867 555,575 $15,977 1,309 - - $633 - $32,867
555,575
kWh
$15,977
1,309
kW-months/year
-
-
MMBtu
$633
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Primary Raw Material Electricity Usage Electricity Demand Natural Gas Primary Raw Material