IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

179

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0934 # 04 Y:2019 04 2019 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $305,911 $903,775 Not Implemented
GT0934 # 05 Y:2019 05 2019 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $445 $2,770 Implemented
GT0934 # 06 Y:2019 06 2019 USE SOLAR HEAT FOR HEAT $37,938 $246,597 Implemented
GT0933 # 01 Y:2019 01 2019 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $10,455 $250 Implemented
GT0933 # 02 Y:2019 02 2019 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $23,854 $13,713 Not Implemented
GT0933 # 03 Y:2019 03 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $199 $213 Implemented
GT0933 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $32,851 $41,392 Implemented
GT0933 # 05 Y:2019 05 2019 INSULATE BARE EQUIPMENT $4,386 $6,741 Not Implemented
GT0933 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,768 $9,616 Implemented
GT0933 # 07 Y:2019 07 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $71,526 $507,835 Not Implemented
GT0897 # 01 Y:2017 01 2017 UPGRADE CONTROLS ON COMPRESSORS $2,357 $1,400 Not Implemented
GT0897 # 02 Y:2017 02 2017 INSULATE BARE EQUIPMENT $499 $607 Implemented
GT0897 # 03 Y:2017 03 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,189 $1,673 Not Implemented
GT0897 # 04 Y:2017 04 2017 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $5,316 $19,418 Implemented
GT0897 # 05 Y:2017 05 2017 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $7,351 $15,070 Implemented
GT0897 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,875 $15,743 Implemented
GT0896 # 01 Y:2017 01 2017 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $15,852 $90,000 Not Implemented
GT0896 # 02 Y:2017 02 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,487 $3,000 Not Implemented
GT0896 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,122 $35,484 Implemented
GT0896 # 04 Y:2017 04 2017 INSTALL OCCUPANCY SENSORS $438 $300 Not Implemented
GT0896 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,749 $6,180 Implemented
GT0896 # 06 Y:2017 06 2017 USE SOLAR HEAT TO MAKE ELECTRICTY $91,181 $355,605 Not Implemented
MI0222 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $94,284 $46,620 Not Implemented
MI0222 # 02 Y:2012 02 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $44,472 $19,980 Not Implemented
MI0222 # 03 Y:2012 03 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $38,910 $2,520 Implemented