IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

56

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UC2407 # 06 Y:2024 06 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $588 $1,300 n/a
UC2407 # 05 Y:2024 05 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $504 $75 n/a
UC2407 # 01 Y:2024 01 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $2,850 $0 n/a
UC2407 # 03 Y:2024 03 2024 INSTALL / REPAIR INSULATION ON STEAM LINES $123 $139 n/a
UC2407 # 04 Y:2024 04 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,157 $100 n/a
UC2407 # 02 Y:2024 02 2024 PAY UTILITY BILLS ON TIME $208 $0 n/a
UC2407 # 08 Y:2024 08 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $115,385 $54,067 n/a
UC2407 # 09 Y:2024 09 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $58,641 $633,762 n/a
UC2407 # 07 Y:2024 07 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,041 $5,000 n/a
UC2307 # 06 Y:2023 06 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $411 $3,486 Not Implemented
UC2307 # 01 Y:2023 01 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $12,379 $0 Not Implemented
UC2307 # 09 Y:2023 09 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,108 $31,637 Not Implemented
UC2307 # 05 Y:2023 05 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $508 $529 Not Implemented
UC2307 # 07 Y:2023 07 2023 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $3,643 $34,992 Not Implemented
UC2307 # 03 Y:2023 03 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $352 $0 Not Implemented
UC2307 # 04 Y:2023 04 2023 REPLACE BOILER $6,269 $41,061 Not Implemented
UC2307 # 02 Y:2023 02 2023 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $4,994 $0 Not Implemented
UC2307 # 08 Y:2023 08 2023 METER WASTE WATER $383 $455 Not Implemented
UC2307 # 10 Y:2023 10 2023 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $2,667 $13,200 Not Implemented
MA0711 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,165 $4,055 Implemented
MA0711 # 04 Y:2013 04 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $2,170 $2,000 Implemented
MA0711 # 03 Y:2013 03 2013 MODERATE COOLING TOWER OUTLET TEMPERATURE $6,314 $14,000 Not Implemented
MA0711 # 02 Y:2013 02 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,430 $25,000 Not Implemented
MA0711 # 01 Y:2013 01 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,618 $35,000 Not Implemented
MA0681 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $1,163 $1,265 Implemented