IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

46

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0959 # 04 Y:2021 04 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $170 $315 Implemented
GT0959 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,641 $1,850 Implemented
GT0959 # 02 Y:2021 02 2021 INSTALL TIMERS AND/OR THERMOSTATS $184 $50 Implemented
GT0959 # 01 Y:2021 01 2021 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $11,495 $800 Implemented
GT0946 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,289 $12,280 Implemented
GT0946 # 01 Y:2020 01 2020 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $4,870 $250 Implemented
GT0946 # 02 Y:2020 02 2020 INSTALL OCCUPANCY SENSORS $16,405 $3,377 Implemented
GT0946 # 03 Y:2020 03 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $3,914 $1,050 Implemented
GT0938 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,814 $18,557 Implemented
GT0938 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,092 $3,500 Implemented
GT0938 # 01 Y:2019 01 2019 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $14,349 $2,000 Implemented
GT0934 # 01 Y:2019 01 2019 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $2,153 $250 Implemented
GT0934 # 02 Y:2019 02 2019 INSULATE BARE EQUIPMENT $2,334 $1,238 Implemented
GT0934 # 06 Y:2019 06 2019 USE SOLAR HEAT FOR HEAT $37,938 $246,597 Implemented
GT0934 # 05 Y:2019 05 2019 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $445 $2,770 Implemented
GT0933 # 01 Y:2019 01 2019 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $10,455 $250 Implemented
GT0933 # 03 Y:2019 03 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $199 $213 Implemented
GT0933 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $32,851 $41,392 Implemented
GT0933 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,768 $9,616 Implemented
GT0897 # 02 Y:2017 02 2017 INSULATE BARE EQUIPMENT $499 $607 Implemented
GT0897 # 04 Y:2017 04 2017 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $5,316 $19,418 Implemented
GT0897 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,875 $15,743 Implemented
GT0897 # 05 Y:2017 05 2017 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $7,351 $15,070 Implemented
GT0896 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,749 $6,180 Implemented
GT0896 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,122 $35,484 Implemented