IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

74

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0241 # 02 Y:2024 02 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,030 $17,040 n/a
UU0241 # 01 Y:2024 01 2024 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $8,700 $12,200 n/a
UU0241 # 08 Y:2024 08 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $589 $750 n/a
UU0241 # 07 Y:2024 07 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $650 $2,200 n/a
UU0241 # 06 Y:2024 06 2024 INSULATE BARE EQUIPMENT $1,150 $3,710 n/a
UU0241 # 05 Y:2024 05 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $2,300 $7,800 n/a
UU0241 # 03 Y:2024 03 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $7,740 $10,080 n/a
UU0241 # 04 Y:2024 04 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,480 $6,000 n/a
UU0230 # 08 Y:2023 08 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $9,790 $1,000 n/a
UU0230 # 11 Y:2023 11 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,121 $33,692 n/a
UU0230 # 10 Y:2023 10 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,460 $1,000 n/a
UU0230 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,018 $26,647 n/a
UU0230 # 02 Y:2023 02 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,818 $12,930 n/a
UU0230 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,861 $1,200 n/a
UU0230 # 07 Y:2023 07 2023 RECOVER WASTE HEAT FROM EQUIPMENT $32,123 $20,174 n/a
UU0230 # 09 Y:2023 09 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,682 $2,000 n/a
UU0230 # 05 Y:2023 05 2023 INSULATE BARE EQUIPMENT $4,607 $4,819 n/a
UU0230 # 06 Y:2023 06 2023 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $7,985 $11,730 n/a
UU0230 # 04 Y:2023 04 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,277 $2,970 n/a
UU0221 # 02 Y:2023 02 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $6,523 $21,923 Not Implemented
UU0221 # 03 Y:2023 03 2023 INSTALL TIMERS AND/OR THERMOSTATS $6,221 $11,385 Implemented
UU0221 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,675 $25,694 Not Implemented
UU0221 # 05 Y:2023 05 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $2,589 $4,500 Implemented
UU0221 # 06 Y:2023 06 2023 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $293 $1,410 Not Implemented
UU0221 # 07 Y:2023 07 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $280 $965 Not Implemented