IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

995

matching recommendations
Reset
NAICS 3251 Basic Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CI0025 # 05 Y:2023 05 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,405 $0 n/a
KS2321 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $1,362 $3,175 n/a
KS2321 # 03 Y:2023 03 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $646 $1,328 n/a
KS2321 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,032 $5,480 n/a
KS2321 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $89,035 $701,322 n/a
KS2321 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,194 $18,538 n/a
KS2321 # 06 Y:2023 06 2023 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $125,249 $627,000 n/a
KS2321 # 07 Y:2023 07 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $5,241 $1,770 n/a
KS2321 # 08 Y:2023 08 2023 ELIMINATE LEAKS IN WATER LINES AND VALVES $29,979 $30 n/a
OK1093 # 11 Y:2023 11 2023 CHANGE METHOD OF DEIONIZED WATER PRODUCTION $98,980 $367,077 Implemented
OK1093 # 13 Y:2023 13 2023 MAKE A NEW BY-PRODUCT $1,221,405 $1,600,000 Implemented
OK1093 # 09 Y:2023 09 2023 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $4,201 $632 Not Implemented
OK1093 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,678 $10,052 Implemented
OK1093 # 10 Y:2023 10 2023 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $31,034 $19,400 Not Implemented
OK1093 # 12 Y:2023 12 2023 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $150,722 $300,000 Implemented
OK1093 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,723 $1,260 Implemented
OK1093 # 06 Y:2023 06 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,010 $0 Implemented
OK1093 # 08 Y:2023 08 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $12,354 $1,420 Implemented
OK1093 # 07 Y:2023 07 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,345 $8,534 Implemented
OK1093 # 03 Y:2023 03 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $29,830 $374,400 Implemented
OK1093 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $420 $900 Implemented
OK1093 # 05 Y:2023 05 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,087 $343 Implemented
MS0406 # 03 Y:2022 03 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $5,220 $0 Implemented
MS0406 # 01 Y:2022 01 2022 REPLACE BOILER $17,347 $165,000 Not Implemented
MS0406 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,570 $0 Not Implemented