IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

44

matching recommendations
Reset
NAICS 32519 Other Basic Organic Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0371 # 13 Y:2014 13 2014 REPAIR AND ELIMINATE STEAM LEAKS $3,675 $1,285 Not Implemented
LE0371 # 01 Y:2014 01 2014 ADJUST BURNERS FOR EFFICIENT OPERATION $15,710 $0 Not Implemented
LE0371 # 06 Y:2014 06 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,119 $317 Not Implemented
LE0371 # 07 Y:2014 07 2014 INSTALL TIMERS AND/OR THERMOSTATS $18,293 $2,740 Not Implemented
LE0371 # 08 Y:2014 08 2014 REPAIR OR REPLACE STEAM TRAPS $963 $400 Not Implemented
LE0371 # 02 Y:2014 02 2014 INSTALL TIMERS AND/OR THERMOSTATS $3,996 $0 Not Implemented
LE0371 # 03 Y:2014 03 2014 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $645 $0 Not Implemented
LE0371 # 04 Y:2014 04 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,667 $28 Implemented
LE0371 # 05 Y:2014 05 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,001 $14 Implemented
LE0371 # 12 Y:2014 12 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $1,819 $4,118 Not Implemented
LE0371 # 09 Y:2014 09 2014 PREHEAT COMBUSTION AIR WITH WASTE HEAT $7,984 $3,000 Not Implemented
LE0371 # 10 Y:2014 10 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $941 $1,000 Implemented
LE0371 # 11 Y:2014 11 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,799 $12,800 Not Implemented
LE0371 # 15 Y:2014 15 2014 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,748 $21,000 Not Implemented
LE0371 # 14 Y:2014 14 2014 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $1,091 $4,140 Implemented
LE0371 # 16 Y:2014 16 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,704 $12,536 Not Implemented
LE0371 # 17 Y:2014 17 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $71 $350 Not Implemented
WV0450 # 13 Y:2012 13 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,764 $1,800 Not Implemented
WV0450 # 12 Y:2012 12 2012 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $7,314 $3,360 Not Implemented
WV0450 # 11 Y:2012 11 2012 DEVELOP A REPAIR/REPLACE POLICY $8,489 $1,210 Implemented
WV0450 # 09 Y:2012 09 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,686 $21,120 Not Implemented
WV0450 # 08 Y:2012 08 2012 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $10,199 $1,000 Not Implemented
WV0450 # 06 Y:2012 06 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $36,667 $21,800 Not Implemented
WV0450 # 05 Y:2012 05 2012 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $97,121 $400,000 Not Implemented
WV0450 # 03 Y:2012 03 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $130,899 $157,320 Implemented