IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,034

matching recommendations
Reset
NAICS 32521 Resin and Synthetic Rubber Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0096 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,715 $39,573 Implemented
UA0096 # 04 Y:2013 04 2013 INSTALL OCCUPANCY SENSORS $1,997 $545 Implemented
UA0096 # 05 Y:2013 05 2013 INSTALL TIMERS AND/OR THERMOSTATS $3,456 $1,320 Implemented
UA0096 # 06 Y:2013 06 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $766 $8 Not Implemented
UA0096 # 07 Y:2013 07 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $485 $400 Not Implemented
UA0096 # 08 Y:2013 08 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $321 $1,000 Not Implemented
NC0461 # 01 Y:2012 01 2012 USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION $163,689 $410,000 Not Implemented
NC0461 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,912 $7,160 Implemented
NC0461 # 03 Y:2012 03 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $81,960 $300,000 Not Implemented
NC0461 # 04 Y:2012 04 2012 ADJUST BURNERS FOR EFFICIENT OPERATION $24,541 $2,400 Implemented
NC0461 # 05 Y:2012 05 2012 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $84,150 $40,000 Implemented
NC0461 # 06 Y:2012 06 2012 REDUCE EXCESSIVE BOILER BLOWDOWN $4,695 $0 Implemented
NC0461 # 07 Y:2012 07 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $41,556 $15,000 Not Implemented
NC0461 # 08 Y:2012 08 2012 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $458,904 $314,375 Implemented
SU0321 # 01 Y:2012 01 2012 REDUCE VENTILATION AIR $5,156 $9,920 Not Implemented
SU0321 # 02 Y:2012 02 2012 UPGRADE OBSOLETE EQUIPMENT $206 $669 Implemented
SU0321 # 03 Y:2012 03 2012 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $124 $395 Implemented
SU0321 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,346 $123,757 Implemented
SU0321 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $955 $4,144 Implemented
SU0321 # 06 Y:2012 06 2012 OPTIMIZE PLANT POWER FACTOR $7,620 $38,838 Not Implemented
SU0321 # 07 Y:2012 07 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,284 $1,655 Implemented
SU0321 # 08 Y:2012 08 2012 ELIMINATE/REDUCE AN OPERATION $2,320 $4,530 Implemented
MI0223 # 01 Y:2012 01 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $40,345 $71,843 Not Implemented
MI0223 # 02 Y:2012 02 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,827 $10,160 Not Implemented
MI0223 # 03 Y:2012 03 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,776 $14,480 Not Implemented